X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434040409000

Well Details

Well ID: 0434040409000
Loading map...
Location: 00/09-04-043-04W4/0
Location Alias: 00/09-04-43-04 W4M
Location Alias 2: 00/09-04-043-04 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 04
Section: 04
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 9B RIBSTONE 9-4-43-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0376741
License Date: 2007-04-27
License Status: Issued
Spud Date: 2007-07-16
Final Drill Date: 2007-07-20
Well Total Depth: 800.00 m
Surface Hole Latitude: 52.676466
Surface Hole Longitude: -110.519221

For data sources see[1][2]

Well History

Date Event
2007-04-27 Obtained License
2007-07-16 Surface Casing Operation Performed
2007-07-17 Direction Drilling Operation Performed - Deviate
2007-07-18 Intermediate Casing Operation Performed
2007-07-18 Well Log Performed
2007-07-19 Well Log Performed
2007-07-20 Finished Drilling
2007-07-20 Perforation Treatment Performed - Open-Hole Completion
2007-07-20 Well Log Performed
2007-07-20 Well Mode changed to Drilled and Cased
2007-07-21 Rig Released
2007-09-11 Perforation Treatment Performed - Jet Perforation
2007-09-12 Perforation Treatment Performed - Remedial Casing
2007-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-12-12 Well Fluid changed to Crude Oil
2007-12-12 Well Mode changed to Potential
2008-01-03 Well Began Production
2008-01-03 Well Fluid changed to Crude Oil
2008-01-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-07-17 230.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-07-20 Open Hole/Barefoot Completion 738.00 800.00 0
2007-09-11 Perforation 278.00 278.50 17
2007-09-12 Remedial Casing Cementing 278.00 278.50 0
2007-10-13 Acid Treatment 738.00 770.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1 0.0 0.0 0.0
2008 8429 0.0 0.0 0.0
2009 7261 0.0 0.0 0.0
2010 8538 0.0 0.0 0.0
2011 8745 0.0 0.0 0.0
2012 8671 0.0 0.0 0.0
2013 8599 0.0 0.0 0.0
2014 5506 0.0 0.0 0.0
2015 7054 0.0 0.0 0.0
2016 8476 0.0 0.0 0.0
2017 8513 0.0 0.0 0.0
2018 8102 0.0 0.0 0.0
2019 7626 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References