X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434021209B02

Well Details

Well ID: 0434021209B02
Loading map...
Location: B0/09-12-043-02W4/2
Location Alias: B0/09-12-43-02 W4M
Location Alias 2: B0/09-12-043-02 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 02
Section: 12
County/Municipality: Chauvin
Well Name: TALISMAN CHAUVS 9-12-43-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0134903
License Date: 1988-07-13
License Status: Issued
Spud Date: 1988-07-17
Final Drill Date: 1988-07-18
Well Total Depth: 685.00 m
Surface Hole Latitude: 52.691308
Surface Hole Longitude: -110.153282

For data sources see[1][2]

Well History

Date Event
1988-07-13 Obtained License
1988-07-17 Surface Casing Operation Performed
1988-07-18 Finished Drilling
1988-07-18 Production Casing Operation Performed
1988-07-19 Rig Released
1988-07-19 Well Log Performed
1988-08-21 Well Log Performed
1988-09-08 Perforation Treatment Performed - Jet Perforation
1988-09-08 Well Log Performed
1990-02-15 Well Mode changed to Drilled and Cased
1990-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-12 Perforation Treatment Performed - Jet Perforation
1990-03-12 Plug Back Performed
1990-03-13 Well Log Performed
1990-05-29 Perforation Treatment Performed - Chemical Squeeze
1990-06-15 Well Began Injection
1990-06-15 Well Fluid changed to Water
1990-06-15 Well Type changed to Injection
2000-03-26 Well Log Performed
2000-05-26 Perforation Treatment Performed - Jet Perforation
2001-12-15 Perforation Treatment Performed - Chemical Squeeze
2001-12-17 Perforation Treatment Performed - Chemical Squeeze
2001-12-18 Perforation Treatment Performed - Chemical Squeeze
2002-02-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-08 Perforation 678.30 679.00 13
1990-03-12 Packing Device Capped w/Cement 674.50 676.50 0
1990-03-12 Perforation 664.00 667.00 13
1990-05-29 Chemical Squeeze 664.00 667.00 0
2000-05-26 Perforation 667.00 670.00 17
2001-12-15 Chemical Squeeze 664.00 670.00 0
2001-12-17 Chemical Squeeze 664.00 670.00 0
2001-12-18 Chemical Squeeze 664.00 670.00 0
2002-02-21 Fracture 664.00 670.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References