X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434020209D00

Well Details

Well ID: 0434020209D00
Loading map...
Location: D0/09-02-043-02W4/0
Location Alias: D0/09-02-43-02 W4M
Location Alias 2: D0/09-02-043-02 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 02
Section: 02
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 9D CHAUV SOUTH 9-2-43-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0177269
License Date: 1995-04-04
License Status: RecCertified
Spud Date: 1995-06-22
Final Drill Date: 1995-06-23
Well Total Depth: 671.00 m
Surface Hole Latitude: 52.677993
Surface Hole Longitude: -110.175093

For data sources see[1][2]

Well History

Date Event
1995-04-04 Obtained License
1995-06-23 Finished Drilling
1995-06-23 Surface Casing Operation Performed
1995-06-23 Well Log Performed
1995-06-23 Well Mode changed to Drilled and Cased
1995-06-24 Production Casing Operation Performed
1995-06-24 Rig Released
1995-07-05 Perforation Treatment Performed - Jet Perforation
1995-07-05 Well Log Performed
1995-07-10 Perforation Treatment Performed - Fractured
1995-07-19 Well Began Production
1995-07-19 Well Fluid changed to Crude Oil
1995-07-19 Well Mode changed to Pumping
1996-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-29 Plug Back Performed
1996-07-29 Well Fluid changed to Crude Oil
1996-07-29 Well Mode changed to Abandoned Zone
1996-08-27 Well Log Performed
1996-09-18 Perforation Treatment Performed - Jet Perforation
1996-09-18 Well Log Performed
1996-09-22 Perforation Treatment Performed - Remedial Casing
1996-09-23 Perforation Treatment Performed - Cement Plug
1996-10-01 Perforation Treatment Performed - Jet Perforation
1996-10-01 Well Log Performed
1996-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-02 Perforation Treatment Performed - Remedial Casing
1996-10-04 Perforation Treatment Performed - Cement Plug
1997-07-29 Well Log Performed
1997-09-09 Well Abandoned
1997-09-09 Well Fluid changed to Crude Oil
1997-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-05 Perforation 641.30 646.00 26
1996-10-02 Acid Treatment 411.20 417.00 0
1996-10-02 Remedial Casing Cementing 411.20 417.00 0
1996-10-04 Cement Plug 358.00 414.00 0
1995-07-10 Fracture 641.30 646.00 0
1996-07-29 Packing Device Capped w/Cement 622.00 630.00 0
1996-09-18 Perforation 554.00 555.00 13
1996-09-18 Perforation 559.00 560.00 13
1996-09-22 Remedial Casing Cementing 554.00 560.00 0
1996-09-23 Cement Plug 460.00 556.00 0
1996-10-01 Perforation 411.20 412.20 13
1996-10-01 Perforation 416.00 417.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 704 0.0 0.0 0.0
1996 48 0.0 0.0 0.0

For data sources see[5]

References