If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434020109B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.677217,"lon":-110.152845,"icon":""}]} |
Location: B0/09-01-043-02W4/0 | |
Location Alias: B0/09-01-43-02 W4M | |
Location Alias 2: B0/09-01-043-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 02 | |
Section: 01 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TALISMAN CHAUVS 9-1-43-2 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0135063 | |
License Date: 1988-07-21 | |
License Status: Issued | |
Spud Date: 1988-07-24 | |
Final Drill Date: 1988-07-26 | |
Well Total Depth: 661.00 m | |
Surface Hole Latitude: 52.677217 | |
Surface Hole Longitude: -110.152845 |
Date | Event |
---|---|
1988-07-21 | Obtained License |
1988-07-24 | Surface Casing Operation Performed |
1988-07-26 | Finished Drilling |
1988-07-26 | Production Casing Operation Performed |
1988-07-26 | Rig Released |
1988-07-26 | Well Mode changed to Drilled and Cased |
1988-08-01 | Well Log Performed |
1988-09-10 | Perforation Treatment Performed - Jet Perforation |
1988-09-10 | Well Log Performed |
1988-09-11 | Well Began Production |
1988-09-11 | Well Fluid changed to Crude Oil |
1988-09-11 | Well Mode changed to Pumping |
1998-03-25 | Perforation Treatment Performed - Jet Perforation |
1998-03-25 | Well Fluid changed to Crude Oil |
1998-03-25 | Well Log Performed |
1998-03-25 | Well Mode changed to Suspended |
1999-12-17 | Plug Back Performed |
1999-12-20 | Well Log Performed |
2000-01-07 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-09-10 | Perforation | 647.00 | 652.00 | 13 |
1998-03-25 | Perforation | 625.00 | 629.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 2424 | 0.0 | 0.0 | 0.0 |
1989 | 8622 | 0.0 | 0.0 | 0.0 |
1990 | 8651 | 0.0 | 0.0 | 0.0 |
1991 | 8421 | 0.0 | 0.0 | 0.0 |
1992 | 8725 | 0.0 | 0.0 | 0.0 |
1993 | 8758 | 0.0 | 0.0 | 0.0 |
1994 | 8005 | 0.0 | 0.0 | 0.0 |
1995 | 8671 | 0.0 | 0.0 | 0.0 |
1996 | 7863 | 0.0 | 0.0 | 0.0 |
1997 | 7364 | 0.0 | 0.0 | 0.0 |
1998 | 1952 | 0.0 | 0.0 | 0.0 |
For data sources see[5]