X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434012704000

Well Details

Well ID: 0434012704000
Loading map...
Location: 00/04-27-043-01W4/0
Location Alias: 00/04-27-43-01 W4M
Location Alias 2: 00/04-27-043-01 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 27
County/Municipality: Municipal District of Wainwright No. 61
Well Name: DEV-PAL CHAUVIN IN 4C-27-43-1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0005787
License Date: 1952-12-10
License Status: RecCertified
Spud Date: 1952-12-16
Final Drill Date: 1952-12-21
Well Total Depth: 655.30 m
Surface Hole Latitude: 52.728733
Surface Hole Longitude: -110.075349

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-10 Obtained License
1952-12-20 Drill Stem Test Performed
1952-12-21 Drill Stem Test Performed
1952-12-21 Finished Drilling
1952-12-21 Well Mode changed to Drilled and Cased
1952-12-22 Production Casing Operation Performed
1953-01-03 Perforation Treatment Performed - Bullet Perforation
1953-01-05 Well Began Production
1953-01-05 Well Fluid changed to Crude Oil
1953-01-05 Well Mode changed to Pumping
1962-02-11 Well Began Injection
1962-02-11 Well Fluid changed to Water
1962-02-11 Well Type changed to Injection
1968-07-13 Perforation Treatment Performed - Bullet Perforation
1994-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-22 Perforation Treatment Performed - Jet Perforation
1994-11-22 Plug Back Performed
1994-11-22 Well Fluid changed to Water
1994-11-22 Well Mode changed to Abandoned
1994-11-22 Well Type changed to Injection
1994-11-23 Perforation Treatment Performed - Remedial Casing
1994-11-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-01-03 Bullet Perforation 626.70 629.10 10
1953-01-03 Bullet Perforation 629.70 630.90 10
1968-07-13 Bullet Perforation 635.20 636.40 7
1994-11-22 Packing Device Capped w/Cement 604.00 612.00 0
1994-11-22 Perforation 159.00 160.00 13
1994-11-23 Remedial Casing Cementing 159.00 160.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0

For data sources see[5]

References