X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434012510050

Well Details

Well ID: 0434012510050
Loading map...
Location: 05/10-25-043-01W4/0
Location Alias: 05/10-25-43-01 W4M
Location Alias 2: 05/10-25-043-01 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 25
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST 10D CHAUV 10-25-43-1
Operator Name: Cardinal Energy Ltd.
License Number: 0209167
License Date: 1997-11-24
License Status: Amended
Spud Date: 1998-02-09
Final Drill Date: 1998-02-28
Well Total Depth: 748.00 m
Surface Hole Latitude: 52.734639
Surface Hole Longitude: -110.016030

For data sources see[1][2]

Well History

Date Event
1997-11-24 Obtained License
1998-02-09 Surface Casing Operation Performed
1998-02-28 Finished Drilling
1998-02-28 Well Log Performed
1998-02-28 Well Mode changed to Drilled and Cased
1998-03-01 Production Casing Operation Performed
1998-03-01 Rig Released
1998-03-02 Well Log Performed
1998-04-24 Perforation Treatment Performed - Jet Perforation
1998-04-24 Well Log Performed
1998-06-25 Well Began Production
1998-06-25 Well Fluid changed to Crude Oil
1998-06-25 Well Mode changed to Pumping
2000-06-01 Well Fluid changed to Crude Oil
2000-06-01 Well Mode changed to Suspended
2000-09-20 Well Fluid changed to Crude Oil
2000-09-20 Well Mode changed to Pumping
2002-03-05 Well Fluid changed to Crude Oil
2002-03-05 Well Mode changed to Suspended
2004-11-17 Perforation Treatment Performed - Cement Squeeze
2004-11-17 Plug Back Performed
2004-11-17 Well Fluid changed to Crude Oil
2004-11-17 Well Mode changed to Abandoned Zone
2004-11-26 Perforation Treatment Performed - Jet Perforation
2004-11-28 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-04-24 Perforation 682.00 684.00 17
2004-11-17 Cement Squeeze 682.00 684.00 0
2004-11-26 Perforation 719.00 722.00 17
2004-11-28 Fracture 719.00 722.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2106 0.0 0.0 0.0
1999 1554 0.0 0.0 0.0
2000 2216 0.0 0.0 0.0
2001 1864 0.0 0.0 0.0

For data sources see[5]

References