X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434012304000

Well Details

Well ID: 0434012304000
Loading map...
Location: 00/04-23-043-01W4/0
Location Alias: 00/04-23-43-01 W4M
Location Alias 2: 00/04-23-043-01 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 23
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TRIAD CHAUVIN IN 4-23-43-1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0030728
License Date: 1966-07-22
License Status: RecCertified
Spud Date: 1966-07-29
Final Drill Date: 1966-08-02
Well Total Depth: 710.80 m
Surface Hole Latitude: 52.712845
Surface Hole Longitude: -110.050193

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-22 Obtained License
1966-08-01 Drill Stem Test Performed
1966-08-02 Finished Drilling
1966-08-03 Production Casing Operation Performed
1967-03-06 Well Mode changed to Drilled and Cased
1967-11-08 Perforation Treatment Performed - Jet Perforation
1968-03-20 Well Began Injection
1968-03-20 Well Fluid changed to Water
1968-03-20 Well Type changed to Injection
1990-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-25 Plug Back Performed
1990-05-25 Well Abandoned
1990-05-25 Well Fluid changed to Water
1990-05-25 Well Log Performed
1990-05-25 Well Mode changed to Abandoned
1990-05-25 Well Type changed to Injection
1996-05-31 Perforation Treatment Performed - Jet Perforation
1996-05-31 Well Log Performed
1996-06-01 Perforation Treatment Performed - Remedial Casing
1996-06-04 Perforation Treatment Performed - Jet Perforation
1996-06-04 Well Log Performed
1996-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-05 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-11-08 Perforation 623.30 625.80 7
1990-05-25 Packing Device Capped w/Cement 586.00 595.00 0
1996-05-31 Perforation 175.00 176.20 14
1996-06-01 Remedial Casing Cementing 175.00 176.20 0
1996-06-04 Perforation 190.00 191.20 13
1996-06-05 Remedial Casing Cementing 190.00 191.20 0
1996-06-05 Packing Device Capped w/Cement 135.00 181.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0

For data sources see[5]

References