X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434012004000

Well Details

Well ID: 0434012004000
Loading map...
Location: 00/04-20-043-01W4/0
Location Alias: 00/04-20-43-01 W4M
Location Alias 2: 00/04-20-043-01 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Wainwright No. 61
Well Name: PINNACLE 4D CHAUVS 4-20-43-1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0160534
License Date: 1993-08-19
License Status: Suspension
Spud Date: 1993-08-31
Final Drill Date: 1993-09-02
Well Total Depth: 731.00 m
Surface Hole Latitude: 52.715477
Surface Hole Longitude: -110.120697

For data sources see[1][2]

Well History

Date Event
1993-08-19 Obtained License
1993-08-31 Well Log Performed
1993-09-01 Surface Casing Operation Performed
1993-09-02 Finished Drilling
1993-09-02 Lost Circulation Occurred
1993-09-02 Well Mode changed to Drilled and Cased
1993-09-03 Production Casing Operation Performed
1993-09-03 Rig Released
1993-09-03 Well Log Performed
1993-09-26 Perforation Treatment Performed - Jet Perforation
1993-09-26 Well Log Performed
1993-09-27 Well Log Performed
1993-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-28 Perforation Treatment Performed - Jet Perforation
1993-09-28 Plug Back Performed
1993-09-28 Well Log Performed
1993-10-05 Well Began Production
1993-10-05 Well Fluid changed to Crude Oil
1993-10-05 Well Mode changed to Pumping
1996-07-01 Perforation Treatment Performed - Cement Plug
1996-07-01 Well Fluid changed to Crude Oil
1996-07-01 Well Mode changed to Suspended
2004-09-11 Perforation Treatment Performed - Jet Perforation
2004-09-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-09-26 Perforation 708.00 709.50 13
1993-09-28 Packing Device Capped w/Cement 703.00 705.00 0
1993-09-28 Perforation 690.00 694.00 13
1996-07-01 Cement Plug 675.30 694.00 0
2004-09-11 Perforation 658.00 660.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 653 0.0 0.0 0.0
1994 2622 0.0 0.0 0.0
1995 1512 0.0 0.0 0.0
1996 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-09-02 Lost Circulation 704.00 731.00

For data sources see[6]

References