X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425083512040

Well Details

Well ID: 0425083512040
Loading map...
Location: 04/12-35-042-08W5/0
Location Alias: 04/12-35-42-08 W5M
Location Alias 2: 04/12-35-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 35
County/Municipality: Clearwater County
Well Name: OBE HZ 102 WILLGR 12-35-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0491328
License Date: 2018-10-05
License Status: Issued
Spud Date: 2019-02-07
Final Drill Date: 2019-02-19
Well Total Depth: 4592.00 m
Surface Hole Latitude: 52.663860
Surface Hole Longitude: -115.016230

For data sources see[1][2]

Well History

Date Event
2018-10-05 Obtained License
2019-02-08 Surface Casing Operation Performed
2019-02-10 Direction Drilling Operation Performed - Deviate
2019-02-12 Intermediate Casing Operation Performed
2019-02-14 Direction Drilling Operation Performed - Horizontal
2019-02-14 Well Log Performed
2019-02-19 Finished Drilling
2019-02-19 Well Log Performed
2019-02-19 Well Mode changed to Drilled and Cased
2019-02-20 Production Casing Operation Performed
2019-02-20 Well Log Performed
2019-02-21 Rig Released
2019-03-01 Well Began Production
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Flowing
2019-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-23 Well Fluid changed to Crude Oil
2019-03-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-07 Precision Drilling Corporation 220 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-10 928.90 Deviate (5 - 79 degrees)
2019-02-14 2104.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-03 Multi-Stage Fracture 4563.70 4563.80 0
2019-03-03 Multi-Stage Fracture 3863.80 3863.90 0
2019-03-03 Multi-Stage Fracture 3787.00 3787.10 0
2019-03-03 Multi-Stage Fracture 3706.20 3706.30 0
2019-03-03 Multi-Stage Fracture 3626.10 3626.20 0
2019-03-03 Multi-Stage Fracture 3547.80 3547.90 0
2019-03-03 Multi-Stage Fracture 3469.60 3469.70 0
2019-03-03 Multi-Stage Fracture 3388.30 3388.40 0
2019-03-03 Multi-Stage Fracture 3306.80 3306.90 0
2019-03-03 Multi-Stage Fracture 3225.10 3225.20 0
2019-03-03 Multi-Stage Fracture 3143.80 3143.90 0
2019-03-03 Multi-Stage Fracture 4510.30 4510.40 0
2019-03-03 Multi-Stage Fracture 3063.50 3063.60 0
2019-03-03 Multi-Stage Fracture 2984.70 2984.80 0
2019-03-03 Multi-Stage Fracture 2903.20 2903.30 0
2019-03-03 Multi-Stage Fracture 2823.30 2823.40 0
2019-03-03 Multi-Stage Fracture 2742.00 2742.10 0
2019-03-03 Multi-Stage Fracture 2659.20 2659.30 0
2019-03-03 Multi-Stage Fracture 2577.20 2577.30 0
2019-03-03 Multi-Stage Fracture 2496.50 2496.60 0
2019-03-03 Multi-Stage Fracture 2415.40 2415.50 0
2019-03-03 Multi-Stage Fracture 2335.00 2335.10 0
2019-03-03 Multi-Stage Fracture 4431.40 4431.50 0
2019-03-03 Multi-Stage Fracture 2252.90 2253.00 0
2019-03-03 Multi-Stage Fracture 2169.80 2169.90 0
2019-03-03 Multi-Stage Fracture 4351.90 4352.00 0
2019-03-03 Multi-Stage Fracture 4271.80 4271.90 0
2019-03-03 Multi-Stage Fracture 4188.80 4188.90 0
2019-03-03 Multi-Stage Fracture 4105.80 4105.90 0
2019-03-03 Multi-Stage Fracture 4026.90 4027.00 0
2019-03-03 Multi-Stage Fracture 3945.50 3945.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-03 2019-03-03 1,957 5,752 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.2342 N/A
water Not Available 100 85.0057 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 4.8059 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 7.0493 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0123 N/A
dibromoacetonitrile 3252-43-5 100 0.0123 N/A
non-hazardous ingredients Not Available 100 0.0123 N/A
polyethylene glycol 25322-68-3 100 0.0123 N/A
sodium bromide 7647-15-6 100 0.0123 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0162 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0921 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.1288 N/A
non-hazardous ingredients Not Available 100 0.1288 N/A
PFC-3 Trican Surfactant aminofunctional polymer 10352 100 0.0451 N/A
glycol ether 10352 100 0.0451 N/A
petroleum distillates 10352 100 0.0451 N/A
silicon compound 10352 100 0.0451 N/A
S-28 Trican Surfactant methanol 67-56-1 100 0.0793 N/A
non-hazardous ingredients Not Available 100 0.0793 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0793 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-27 2019-03-04 Surface Water - River 5634

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6834 0.0 0.0 0.0
2020 2078 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-22 No Incident Encountered 0.00 0.00
2019-03-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References