X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425083302030

Well Details

Well ID: 0425083302030
Loading map...
Location: 03/02-33-042-08W5/0
Location Alias: 03/02-33-42-08 W5M
Location Alias 2: 03/02-33-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 33
County/Municipality: Clearwater County
Well Name: PENN WEST 103 HZ WILLGR 2-33-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0475015
License Date: 2015-03-18
License Status: Issued
Spud Date: 2015-08-07
Final Drill Date: 2015-08-24
Well Total Depth: 4502.00 m
Surface Hole Latitude: 52.680017
Surface Hole Longitude: -115.092506

For data sources see[1][2]

Well History

Date Event
2015-03-18 Obtained License
2015-08-09 Surface Casing Operation Performed
2015-08-11 Direction Drilling Operation Performed - Deviate
2015-08-13 Well Log Performed
2015-08-14 Intermediate Casing Operation Performed
2015-08-15 Direction Drilling Operation Performed - Horizontal
2015-08-24 Finished Drilling
2015-08-24 Well Log Performed
2015-08-24 Well Mode changed to Drilled and Cased
2015-08-26 Liner Casing Operation Performed
2015-08-28 Rig Released
2015-08-29 Well Log Performed
2015-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-01 Perforation Treatment Performed - Open-Hole Completion
2015-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-02 Well Began Production
2015-09-02 Well Fluid changed to Crude Oil
2015-09-02 Well Mode changed to Flowing
2015-09-04 Well Log Performed
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-08-07 Precision Drilling Corporation 281 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-11 1617.00 Deviate (5 - 79 degrees)
2015-08-15 2169.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-01 Open Hole/Barefoot Completion 4498.50 4502.00 0
2015-09-01 Multi-Stage Fracture 3632.40 3632.50 0
2015-09-01 Multi-Stage Fracture 3549.50 3549.60 0
2015-09-01 Multi-Stage Fracture 3468.10 3468.20 0
2015-09-01 Multi-Stage Fracture 3386.00 3386.10 0
2015-09-01 Multi-Stage Fracture 3305.90 3306.00 0
2015-09-01 Multi-Stage Fracture 3220.70 3220.80 0
2015-09-01 Multi-Stage Fracture 3136.10 3136.20 0
2015-09-01 Multi-Stage Fracture 3050.50 3050.60 0
2015-09-01 Multi-Stage Fracture 2965.00 2965.10 0
2015-09-02 Multi-Stage Fracture 2881.80 2881.90 0
2015-09-01 Multi-Stage Fracture 4484.00 4484.10 0
2015-09-02 Multi-Stage Fracture 2798.40 2798.50 0
2015-09-02 Multi-Stage Fracture 2716.20 2716.30 0
2015-09-02 Multi-Stage Fracture 2500.20 2500.30 0
2015-09-02 Multi-Stage Fracture 2404.10 2404.20 0
2015-09-02 Multi-Stage Fracture 2306.50 2306.60 0
2015-09-02 Multi-Stage Fracture 2199.80 2199.90 0
2015-09-01 Multi-Stage Fracture 4415.10 4415.20 0
2015-09-01 Multi-Stage Fracture 4319.80 4319.90 0
2015-09-01 Multi-Stage Fracture 4223.70 4223.80 0
2015-09-01 Multi-Stage Fracture 4126.70 4126.80 0
2015-09-01 Multi-Stage Fracture 3892.10 3892.20 0
2015-09-01 Multi-Stage Fracture 3796.60 3796.70 0
2015-09-01 Multi-Stage Fracture 3714.40 3714.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-01 2015-09-02 1,976 3,905 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.6125 N/A
water Not Available 100 84.6705 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 12.4024 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
polyethylene glycol 25322-68-3 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.009 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1397 N/A
non-hazardous ingredients Not Available 100 0.1397 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0431 N/A
propylene glycol 57-55-6 100 0.0431 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.112 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.112 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.112 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-31 2015-09-03 Surface Water - River 4164

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1823 0.0 0.0 0.0
2016 8592 0.0 0.0 0.0
2017 8087 0.0 0.0 0.0
2018 8543 0.0 0.0 0.0
2019 8496 0.0 0.0 0.0
2020 2157 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-28 No Incident Encountered 0.00 0.00
2015-09-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References