X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425083301000

Well Details

Well ID: 0425083301000
Loading map...
Location: 00/01-33-042-08W5/0
Location Alias: 00/01-33-42-08 W5M
Location Alias 2: 00/01-33-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 33
County/Municipality: Clearwater County
Well Name: PENN WEST HZ WILLGR 1-33-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0475368
License Date: 2015-05-01
License Status: Issued
Spud Date: 2015-10-31
Final Drill Date: 2015-11-12
Well Total Depth: 4300.00 m
Surface Hole Latitude: 52.678217
Surface Hole Longitude: -115.081804

For data sources see[1][2]

Well History

Date Event
2015-05-01 Obtained License
2015-11-01 Surface Casing Operation Performed
2015-11-03 Direction Drilling Operation Performed - Deviate
2015-11-04 Well Log Performed
2015-11-06 Intermediate Casing Operation Performed
2015-11-07 Direction Drilling Operation Performed - Horizontal
2015-11-12 Finished Drilling
2015-11-12 Well Log Performed
2015-11-12 Well Mode changed to Drilled and Cased
2015-11-14 Liner Casing Operation Performed
2015-11-16 Rig Released
2015-11-19 Well Log Performed
2015-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-23 Perforation Treatment Performed - Open-Hole Completion
2015-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-24 Well Began Production
2015-11-24 Well Fluid changed to Crude Oil
2015-11-24 Well Mode changed to Flowing
2015-11-30 Well Log Performed
2015-12-17 Well Fluid changed to Crude Oil
2015-12-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-10-31 Precision Drilling Corporation 281 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-11-03 1588.00 Deviate (5 - 79 degrees)
2015-11-07 2139.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-11-23 Open Hole/Barefoot Completion 4295.00 4300.00 0
2015-11-23 Multi-Stage Fracture 3587.60 3587.70 0
2015-11-23 Multi-Stage Fracture 3502.80 3502.90 0
2015-11-23 Multi-Stage Fracture 3417.90 3418.00 0
2015-11-23 Multi-Stage Fracture 3332.70 3332.80 0
2015-11-23 Multi-Stage Fracture 3246.80 3246.90 0
2015-11-23 Multi-Stage Fracture 3160.80 3160.90 0
2015-11-23 Multi-Stage Fracture 3074.90 3075.00 0
2015-11-23 Multi-Stage Fracture 2989.00 2989.10 0
2015-11-23 Multi-Stage Fracture 2904.00 2904.10 0
2015-11-24 Multi-Stage Fracture 2818.20 2818.90 0
2015-11-23 Multi-Stage Fracture 4255.80 4255.90 0
2015-11-24 Multi-Stage Fracture 2732.90 2733.00 0
2015-11-24 Multi-Stage Fracture 2647.80 2647.90 0
2015-11-24 Multi-Stage Fracture 2563.30 2563.40 0
2015-11-24 Multi-Stage Fracture 2479.80 2479.90 0
2015-11-24 Multi-Stage Fracture 2394.30 2394.40 0
2015-11-24 Multi-Stage Fracture 2309.10 2309.20 0
2015-11-24 Multi-Stage Fracture 2224.40 2224.50 0
2015-11-23 Multi-Stage Fracture 4182.20 4182.30 0
2015-11-23 Multi-Stage Fracture 4096.30 4096.40 0
2015-11-23 Multi-Stage Fracture 4013.70 4013.80 0
2015-11-23 Multi-Stage Fracture 3927.80 3927.90 0
2015-11-23 Multi-Stage Fracture 3845.20 3845.30 0
2015-11-23 Multi-Stage Fracture 3759.40 3759.50 0
2015-11-23 Multi-Stage Fracture 3673.50 3673.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-23 2015-11-24 1,952 3,981 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.8882 N/A
water Not Available 100 85.2007 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 11.596 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0106 N/A
dibromoacetonitrile 3252-43-5 100 0.0106 N/A
non-hazardous ingredients Not Available 100 0.0106 N/A
polyethylene glycol 25322-68-3 100 0.0106 N/A
sodium bromide 7647-15-6 100 0.0106 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.009 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1405 N/A
non-hazardous ingredients Not Available 100 0.1405 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0434 N/A
propylene glycol 57-55-6 100 0.0434 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.1112 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.1112 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1112 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-22 2015-11-26 Surface Water - River 4113

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 284 0.0 0.0 0.0
2016 8138 0.0 0.0 0.0
2017 8414 0.0 0.0 0.0
2018 8519 0.0 0.0 0.0
2019 8723 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-11-16 No Incident Encountered 0.00 0.00
2015-12-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References