X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425083204020

Well Details

Well ID: 0425083204020
Loading map...
Location: 02/04-32-042-08W5/0
Location Alias: 02/04-32-42-08 W5M
Location Alias 2: 02/04-32-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 32
County/Municipality: Clearwater County
Well Name: PENN WEST 102 HZ WILLGR 4-32-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0480322
License Date: 2016-09-09
License Status: Amended
Spud Date: 2016-11-06
Final Drill Date: 2016-11-26
Well Total Depth: 4501.00 m
Surface Hole Latitude: 52.679122
Surface Hole Longitude: -115.115739

For data sources see[1][2]

Well History

Date Event
2016-09-09 Obtained License
2016-11-06 Surface Casing Operation Performed
2016-11-08 Direction Drilling Operation Performed - Deviate
2016-11-09 Direction Drilling Operation Performed - Horizontal
2016-11-09 Intermediate Casing Operation Performed
2016-11-15 Well Log Performed
2016-11-23 Liner Casing Operation Performed
2016-11-23 Well Log Performed
2016-11-26 Finished Drilling
2016-11-26 Rig Released
2016-11-26 Well Log Performed
2016-11-26 Well Mode changed to Drilled and Cased
2016-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-20 Well Began Production
2016-12-20 Well Fluid changed to Crude Oil
2016-12-20 Well Mode changed to Flowing
2017-01-04 Well Log Performed
2017-01-15 Well Fluid changed to Crude Oil
2017-01-15 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-11-08 712.70 Deviate (5 - 79 degrees)
2016-11-09 2173.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-12-16 Multi-Stage Fracture 4479.70 4481.00 0
2016-12-16 Multi-Stage Fracture 3740.90 3741.70 0
2016-12-17 Multi-Stage Fracture 3645.70 3646.50 0
2016-12-17 Multi-Stage Fracture 3563.90 3564.70 0
2016-12-17 Multi-Stage Fracture 3482.10 3482.90 0
2016-12-17 Multi-Stage Fracture 3387.20 3388.00 0
2016-12-17 Multi-Stage Fracture 3305.60 3306.40 0
2016-12-17 Multi-Stage Fracture 3223.90 3224.70 0
2016-12-19 Multi-Stage Fracture 3128.80 3129.60 0
2016-12-19 Multi-Stage Fracture 3047.50 3048.30 0
2016-12-19 Multi-Stage Fracture 2965.20 2966.00 0
2016-12-16 Multi-Stage Fracture 4422.70 4423.50 0
2016-12-19 Multi-Stage Fracture 2869.80 2870.60 0
2016-12-19 Multi-Stage Fracture 2787.90 2788.70 0
2016-12-19 Multi-Stage Fracture 2706.00 2706.80 0
2016-12-19 Multi-Stage Fracture 2611.40 2612.20 0
2016-12-19 Multi-Stage Fracture 2529.80 2530.60 0
2016-12-19 Multi-Stage Fracture 2448.10 2448.90 0
2016-12-19 Multi-Stage Fracture 2218.50 2219.30 0
2016-12-16 Multi-Stage Fracture 4340.80 4341.60 0
2016-12-16 Multi-Stage Fracture 4258.80 4259.60 0
2016-12-16 Multi-Stage Fracture 4163.50 4164.30 0
2016-12-16 Multi-Stage Fracture 4081.50 4082.30 0
2016-12-16 Multi-Stage Fracture 3999.70 4000.50 0
2016-12-16 Multi-Stage Fracture 3904.40 3905.20 0
2016-12-16 Multi-Stage Fracture 3822.60 3823.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-16 2016-12-19 2,008 5,508 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 85.9291 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 10.181 N/A
Econocide B1008 Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0278 N/A
water 7732-18-5 100 0.0278 N/A
IH-CS-3 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.0866 N/A
Nitrogen Iron Horse Energy Services Energizing Fluid nitrogen 7727-37-9 100 3.6609 N/A
IH-FR-2A Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.045 N/A
IH-NE-6 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.0693 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.0693 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.0693 N/A
Heavy aromatic naptha 64742-94-5 100 0.0693 N/A
Isopropanol 67-63-0 100 0.0693 N/A
Methanol 67-56-1 100 0.0693 N/A
Polyethylene glycol 25322-68-3 100 0.0693 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-12-13 2016-12-17 Surface Water - Runoff 6568

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2 0.0 0.0 0.0
2017 8404 0.0 0.0 0.0
2018 8376 0.0 0.0 0.0
2019 8431 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-26 No Incident Encountered 0.00 0.00
2017-01-05 No Incident Encountered 0.00 0.00

For data sources see[9]

References