If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425083005020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.645389,"lon":-115.125707,"icon":""}]} |
Location: 02/05-30-042-08W5/0 | |
Location Alias: 02/05-30-42-08 W5M | |
Location Alias 2: 02/05-30-042-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 08 | |
Section: 30 | |
County/Municipality: Clearwater County | |
Well Name: BELLATRIX HZ WILLGR 5-30-42-8 | |
Operator Name: Bellatrix Exploration Ltd. | |
License Number: 0422219 | |
License Date: 2010-07-27 | |
License Status: Issued | |
Spud Date: 2010-08-12 | |
Final Drill Date: 2010-09-02 | |
Well Total Depth: 3580.00 m | |
Surface Hole Latitude: 52.645389 | |
Surface Hole Longitude: -115.125707 |
Date | Event |
---|---|
2010-07-27 | Obtained License |
2010-08-12 | Well Log Performed |
2010-08-16 | Surface Casing Operation Performed |
2010-08-20 | Direction Drilling Operation Performed - Horizontal |
2010-08-23 | Intermediate Casing Operation Performed |
2010-08-24 | Well Log Performed |
2010-09-02 | Finished Drilling |
2010-09-02 | Well Log Performed |
2010-09-02 | Well Mode changed to Drilled and Cased |
2010-09-07 | Rig Released |
2010-09-09 | Liner Casing Operation Performed |
2010-09-23 | Well Log Performed |
2010-10-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-04 | Perforation Treatment Performed - Open-Hole Completion |
2010-10-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-09 | Well Began Production |
2010-10-09 | Well Fluid changed to Crude Oil |
2010-10-09 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-20 | 1745.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-04 | Open Hole/Barefoot Completion | 2104.00 | 3580.00 | 0 |
2010-10-06 | Multi-Stage Fracture | 2974.90 | 2975.00 | 0 |
2010-10-08 | Multi-Stage Fracture | 2889.50 | 2889.60 | 0 |
2010-10-08 | Multi-Stage Fracture | 2618.80 | 2618.90 | 0 |
2010-10-08 | Multi-Stage Fracture | 2746.80 | 2746.90 | 0 |
2010-10-08 | Multi-Stage Fracture | 2675.40 | 2675.50 | 0 |
2010-10-08 | Multi-Stage Fracture | 2603.40 | 2603.50 | 0 |
2010-10-08 | Multi-Stage Fracture | 2531.90 | 2532.00 | 0 |
2010-10-08 | Multi-Stage Fracture | 2447.20 | 2447.30 | 0 |
2010-10-08 | Multi-Stage Fracture | 2376.20 | 2376.30 | 0 |
2010-10-09 | Multi-Stage Fracture | 2308.80 | 2308.90 | 0 |
2010-10-04 | Multi-Stage Fracture | 3565.70 | 3565.80 | 0 |
2010-10-09 | Multi-Stage Fracture | 2226.10 | 2226.20 | 0 |
2010-10-09 | Multi-Stage Fracture | 2153.90 | 2154.00 | 0 |
2010-10-04 | Multi-Stage Fracture | 3489.00 | 3489.10 | 0 |
2010-10-04 | Multi-Stage Fracture | 3417.90 | 3418.00 | 0 |
2010-10-04 | Multi-Stage Fracture | 3332.80 | 3332.90 | 0 |
2010-10-06 | Multi-Stage Fracture | 3261.10 | 3261.20 | 0 |
2010-10-06 | Multi-Stage Fracture | 3189.20 | 3189.30 | 0 |
2010-10-06 | Multi-Stage Fracture | 3117.60 | 3117.70 | 0 |
2010-10-06 | Multi-Stage Fracture | 3046.50 | 3046.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1884 | 0.0 | 0.0 | 0.0 |
2011 | 7603 | 0.0 | 0.0 | 0.0 |
2012 | 8210 | 0.0 | 0.0 | 0.0 |
2013 | 8607 | 0.0 | 0.0 | 0.0 |
2014 | 8630 | 0.0 | 0.0 | 0.0 |
2015 | 7794 | 0.0 | 0.0 | 0.0 |
2016 | 8745 | 0.0 | 0.0 | 0.0 |
2017 | 8404 | 0.0 | 0.0 | 0.0 |
2018 | 6539 | 0.0 | 0.0 | 0.0 |
2019 | 7027 | 0.0 | 0.0 | 0.0 |
2020 | 2060 | 0.0 | 0.0 | 0.0 |
For data sources see[6]