X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425083005020

Well Details

Well ID: 0425083005020
Loading map...
Location: 02/05-30-042-08W5/0
Location Alias: 02/05-30-42-08 W5M
Location Alias 2: 02/05-30-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 30
County/Municipality: Clearwater County
Well Name: BELLATRIX HZ WILLGR 5-30-42-8
Operator Name: Bellatrix Exploration Ltd.
License Number: 0422219
License Date: 2010-07-27
License Status: Issued
Spud Date: 2010-08-12
Final Drill Date: 2010-09-02
Well Total Depth: 3580.00 m
Surface Hole Latitude: 52.645389
Surface Hole Longitude: -115.125707

For data sources see[1][2]

Well History

Date Event
2010-07-27 Obtained License
2010-08-12 Well Log Performed
2010-08-16 Surface Casing Operation Performed
2010-08-20 Direction Drilling Operation Performed - Horizontal
2010-08-23 Intermediate Casing Operation Performed
2010-08-24 Well Log Performed
2010-09-02 Finished Drilling
2010-09-02 Well Log Performed
2010-09-02 Well Mode changed to Drilled and Cased
2010-09-07 Rig Released
2010-09-09 Liner Casing Operation Performed
2010-09-23 Well Log Performed
2010-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-04 Perforation Treatment Performed - Open-Hole Completion
2010-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-09 Well Began Production
2010-10-09 Well Fluid changed to Crude Oil
2010-10-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-08-20 1745.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-04 Open Hole/Barefoot Completion 2104.00 3580.00 0
2010-10-06 Multi-Stage Fracture 2974.90 2975.00 0
2010-10-08 Multi-Stage Fracture 2889.50 2889.60 0
2010-10-08 Multi-Stage Fracture 2618.80 2618.90 0
2010-10-08 Multi-Stage Fracture 2746.80 2746.90 0
2010-10-08 Multi-Stage Fracture 2675.40 2675.50 0
2010-10-08 Multi-Stage Fracture 2603.40 2603.50 0
2010-10-08 Multi-Stage Fracture 2531.90 2532.00 0
2010-10-08 Multi-Stage Fracture 2447.20 2447.30 0
2010-10-08 Multi-Stage Fracture 2376.20 2376.30 0
2010-10-09 Multi-Stage Fracture 2308.80 2308.90 0
2010-10-04 Multi-Stage Fracture 3565.70 3565.80 0
2010-10-09 Multi-Stage Fracture 2226.10 2226.20 0
2010-10-09 Multi-Stage Fracture 2153.90 2154.00 0
2010-10-04 Multi-Stage Fracture 3489.00 3489.10 0
2010-10-04 Multi-Stage Fracture 3417.90 3418.00 0
2010-10-04 Multi-Stage Fracture 3332.80 3332.90 0
2010-10-06 Multi-Stage Fracture 3261.10 3261.20 0
2010-10-06 Multi-Stage Fracture 3189.20 3189.30 0
2010-10-06 Multi-Stage Fracture 3117.60 3117.70 0
2010-10-06 Multi-Stage Fracture 3046.50 3046.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1884 0.0 0.0 0.0
2011 7603 0.0 0.0 0.0
2012 8210 0.0 0.0 0.0
2013 8607 0.0 0.0 0.0
2014 8630 0.0 0.0 0.0
2015 7794 0.0 0.0 0.0
2016 8745 0.0 0.0 0.0
2017 8404 0.0 0.0 0.0
2018 6539 0.0 0.0 0.0
2019 7027 0.0 0.0 0.0
2020 2060 0.0 0.0 0.0

For data sources see[6]

References