X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425082709000

Well Details

Well ID: 0425082709000
Loading map...
Location: 00/09-27-042-08W5/0
Location Alias: 00/09-27-42-08 W5M
Location Alias 2: 00/09-27-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 27
County/Municipality: Clearwater County
Well Name: PENN WEST HZ WILLGR 9-27-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0469296
License Date: 2014-08-21
License Status: Amended
Spud Date: 2015-01-10
Final Drill Date: 2015-01-25
Well Total Depth: 4300.00 m
Surface Hole Latitude: 52.649900
Surface Hole Longitude: -115.094477

For data sources see[1][2]

Well History

Date Event
2014-08-21 Obtained License
2015-01-12 Surface Casing Operation Performed
2015-01-13 Direction Drilling Operation Performed - Deviate
2015-01-15 Well Log Performed
2015-01-16 Intermediate Casing Operation Performed
2015-01-17 Direction Drilling Operation Performed - Horizontal
2015-01-25 Finished Drilling
2015-01-25 Well Log Performed
2015-01-25 Well Mode changed to Drilled and Cased
2015-01-27 Liner Casing Operation Performed
2015-01-27 Rig Released
2015-01-27 Well Log Performed
2015-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-04-02 Perforation Treatment Performed - Open-Hole Completion
2015-04-02 Well Began Production
2015-04-02 Well Fluid changed to Crude Oil
2015-04-02 Well Mode changed to Flowing
2015-04-29 Well Fluid changed to Crude Oil
2015-04-29 Well Mode changed to Pumping
2018-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-10 Precision Drilling Corporation 281 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-13 1612.00 Deviate (5 - 79 degrees)
2015-01-17 2131.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-04-02 Open Hole/Barefoot Completion 4293.50 4300.00 0
2015-04-02 Multi-Stage Fracture 3501.70 3501.80 0
2015-04-02 Multi-Stage Fracture 3419.90 3420.00 0
2015-04-02 Multi-Stage Fracture 3324.40 3324.50 0
2015-04-02 Multi-Stage Fracture 3242.40 3242.50 0
2015-04-02 Multi-Stage Fracture 3147.30 3147.40 0
2015-04-02 Multi-Stage Fracture 3065.50 3065.60 0
2015-04-02 Multi-Stage Fracture 2983.70 2983.80 0
2015-04-02 Multi-Stage Fracture 2901.90 2902.00 0
2015-04-02 Multi-Stage Fracture 2820.00 2820.10 0
2015-04-02 Multi-Stage Fracture 2724.60 2724.70 0
2015-04-02 Multi-Stage Fracture 4278.70 4278.80 0
2015-04-02 Multi-Stage Fracture 2642.80 2642.90 0
2015-04-02 Multi-Stage Fracture 2560.90 2561.00 0
2015-04-02 Multi-Stage Fracture 2478.80 2478.90 0
2015-04-02 Multi-Stage Fracture 2383.50 2383.60 0
2015-04-02 Multi-Stage Fracture 2301.50 2301.60 0
2018-08-14 Acid Treatment 2301.50 4278.80 0
2015-04-02 Multi-Stage Fracture 4210.10 4210.20 0
2015-04-02 Multi-Stage Fracture 4114.60 4114.70 0
2015-04-02 Multi-Stage Fracture 3924.60 3924.70 0
2015-04-02 Multi-Stage Fracture 3842.90 3843.00 0
2015-04-02 Multi-Stage Fracture 3760.90 3761.00 0
2015-04-02 Multi-Stage Fracture 3678.90 3679.00 0
2015-04-02 Multi-Stage Fracture 3583.60 3583.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-04-02 2015-04-02 1,962 3,373 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.9854 N/A
water Not Available 100 82.9753 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 13.7263 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0103 N/A
dibromoacetonitrile 3252-43-5 100 0.0103 N/A
non-hazardous ingredients Not Available 100 0.0103 N/A
polyethylene glycol 25322-68-3 100 0.0103 N/A
sodium bromide 7647-15-6 100 0.0103 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0088 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1369 N/A
non-hazardous ingredients Not Available 100 0.1369 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0456 N/A
propylene glycol 57-55-6 100 0.0456 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.111 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.111 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.111 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-03-30 2015-04-02 Surface Water - River 3442

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 5452 0.0 0.0 0.0
2016 8730 0.0 0.0 0.0
2017 8555 0.0 0.0 0.0
2018 8471 0.0 0.0 0.0
2019 3448 0.0 0.0 0.0
2020 2133 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-27 No Incident Encountered 0.00 0.00
2015-04-06 No Incident Encountered 0.00 0.00
2018-08-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References