X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425082305000

Well Details

Well ID: 0425082305000
Loading map...
Location: 00/05-23-042-08W5/0
Location Alias: 00/05-23-42-08 W5M
Location Alias 2: 00/05-23-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 23
County/Municipality: Clearwater County
Well Name: PENN WEST HZ WILLGR 5-23-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0470081
License Date: 2014-09-19
License Status: Issued
Spud Date: 2015-02-11
Final Drill Date: 2015-02-21
Well Total Depth: 3752.00 m
Surface Hole Latitude: 52.626049
Surface Hole Longitude: -115.029518

For data sources see[1][2]

Well History

Date Event
2014-09-19 Obtained License
2015-02-13 Surface Casing Operation Performed
2015-02-15 Direction Drilling Operation Performed - Deviate
2015-02-16 Well Log Performed
2015-02-17 Intermediate Casing Operation Performed
2015-02-18 Direction Drilling Operation Performed - Horizontal
2015-02-21 Finished Drilling
2015-02-21 Well Log Performed
2015-02-21 Well Mode changed to Drilled and Cased
2015-02-22 Well Log Performed
2015-02-23 Liner Casing Operation Performed
2015-02-23 Well Log Performed
2015-02-24 Rig Released
2015-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-06 Perforation Treatment Performed - Open-Hole Completion
2015-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-07 Well Began Production
2015-03-07 Well Fluid changed to Crude Oil
2015-03-07 Well Mode changed to Flowing
2015-03-31 Well Fluid changed to Crude Oil
2015-03-31 Well Mode changed to Pumping
2019-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-11 Akita Drilling Ltd. 35 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-02-15 1542.00 Deviate (5 - 79 degrees)
2015-02-18 2164.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-03-06 Open Hole/Barefoot Completion 3744.50 3752.00 0
2015-03-07 Multi-Stage Fracture 3068.60 3068.70 0
2015-03-07 Multi-Stage Fracture 2973.60 2973.70 0
2015-03-07 Multi-Stage Fracture 2893.90 2894.00 0
2015-03-07 Multi-Stage Fracture 2799.00 2799.10 0
2015-03-07 Multi-Stage Fracture 2717.60 2717.70 0
2015-03-07 Multi-Stage Fracture 2625.70 2625.80 0
2015-03-07 Multi-Stage Fracture 2544.70 2544.80 0
2015-03-07 Multi-Stage Fracture 2449.70 2449.80 0
2015-03-07 Multi-Stage Fracture 2368.30 2368.40 0
2015-03-07 Multi-Stage Fracture 2274.90 2275.00 0
2015-03-06 Multi-Stage Fracture 3729.70 3729.80 0
2019-08-23 Acid Treatment 2274.90 3752.00 0
2015-03-06 Multi-Stage Fracture 3674.90 3675.00 0
2015-03-06 Multi-Stage Fracture 3581.50 3581.60 0
2015-03-06 Multi-Stage Fracture 3501.40 3501.50 0
2015-03-07 Multi-Stage Fracture 3420.10 3420.20 0
2015-03-07 Multi-Stage Fracture 3326.00 3326.10 0
2015-03-07 Multi-Stage Fracture 3231.30 3231.40 0
2015-03-07 Multi-Stage Fracture 3149.90 3150.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-06 2015-03-07 1,982 2,789 N/A
2 2015-03-06 2015-03-06 1,982 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.2651 N/A
water Not Available 100 83.9362 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 12.3719 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.01 N/A
dibromoacetonitrile 3252-43-5 100 0.01 N/A
non-hazardous ingredients Not Available 100 0.01 N/A
polyethylene glycol 25322-68-3 100 0.01 N/A
sodium bromide 7647-15-6 100 0.01 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0127 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1415 N/A
non-hazardous ingredients Not Available 100 0.1415 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0499 N/A
propylene glycol 57-55-6 100 0.0499 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.2124 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.2124 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.2124 N/A
2 GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0127 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-03-04 2015-03-06 Surface Water - River 2808

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6480 0.0 0.0 0.0
2016 8718 0.0 0.0 0.0
2017 8448 0.0 0.0 0.0
2018 8334 0.0 0.0 0.0
2019 8163 0.0 0.0 0.0
2020 2051 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-24 No Incident Encountered 0.00 0.00
2015-03-08 No Incident Encountered 0.00 0.00
2019-08-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References