X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425081104020

Well Details

Well ID: 0425081104020
Loading map...
Location: 02/04-11-042-08W5/0
Location Alias: 02/04-11-42-08 W5M
Location Alias 2: 02/04-11-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 11
County/Municipality: Clearwater County
Well Name: PENN WEST 102 HZ FERRIER 4-11-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0467982
License Date: 2014-07-10
License Status: Amended
Spud Date: 2014-10-14
Final Drill Date: 2014-10-27
Well Total Depth: 3632.00 m
Surface Hole Latitude: 52.600994
Surface Hole Longitude: -115.026510

For data sources see[1][2]

Well History

Date Event
2014-07-10 Obtained License
2014-10-16 Surface Casing Operation Performed
2014-10-18 Direction Drilling Operation Performed - Deviate
2014-10-20 Well Log Performed
2014-10-22 Intermediate Casing Operation Performed
2014-10-23 Direction Drilling Operation Performed - Horizontal
2014-10-27 Finished Drilling
2014-10-27 Well Log Performed
2014-10-27 Well Mode changed to Drilled and Cased
2014-10-28 Liner Casing Operation Performed
2014-10-29 Rig Released
2014-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-06 Perforation Treatment Performed - Open-Hole Completion
2014-12-02 Well Began Production
2014-12-02 Well Fluid changed to Crude Oil
2014-12-02 Well Mode changed to Pumping
2019-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-14 Akita Drilling Ltd. 35 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-18 700.00 Deviate (5 - 79 degrees)
2014-10-23 2128.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-06 Open Hole/Barefoot Completion 3627.00 3632.00 0
2014-11-06 Multi-Stage Fracture 2918.50 2918.60 0
2014-11-06 Multi-Stage Fracture 2836.90 2837.00 0
2014-11-06 Multi-Stage Fracture 2741.50 2741.60 0
2014-11-06 Multi-Stage Fracture 2659.80 2659.90 0
2014-11-06 Multi-Stage Fracture 2577.90 2578.00 0
2014-11-06 Multi-Stage Fracture 2469.20 2469.30 0
2014-11-06 Multi-Stage Fracture 2387.40 2387.50 0
2014-11-06 Multi-Stage Fracture 2305.80 2305.90 0
2014-11-06 Multi-Stage Fracture 2211.00 2211.10 0
2019-08-21 Acid Treatment 2211.00 3632.00 0
2014-11-06 Multi-Stage Fracture 3617.90 3618.00 0
2014-11-06 Multi-Stage Fracture 3543.60 3543.70 0
2014-11-06 Multi-Stage Fracture 3448.70 3448.80 0
2014-11-06 Multi-Stage Fracture 3366.90 3367.00 0
2014-11-06 Multi-Stage Fracture 3272.00 3272.10 0
2014-11-06 Multi-Stage Fracture 3190.60 3190.70 0
2014-11-06 Multi-Stage Fracture 3095.70 3095.80 0
2014-11-06 Multi-Stage Fracture 3013.70 3013.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-06 2014-11-06 1,975 2,377 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.7536 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 11.8003 N/A
Crystalline silica. quartz 14808-60-7 100 11.8003 N/A
Iron Oxide 1309-37-1 100 11.8004 N/A
Titanium Oxide 13463-67-7 100 11.8002 N/A
Sand (30/50) Ottawa Canyon Aluminum Oxide 1344-28-1 100 2.95 N/A
Crystalline silica. quartz 14808-60-7 100 2.95 N/A
Iron Oxide 1309-37-1 100 2.95 N/A
Titanium Oxide 13463-67-7 100 2.95 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0124 N/A
Water 7732-18-5 100 0.0124 N/A
CAN-2301 Breaker (Oxidizer) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0077 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0077 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0891 N/A
Water 7732-18-5 100 0.0891 N/A
CAN-2411 Non-emulsifier Canyon Demulsifier Ethylene glycol 107-21-1 100 0.0816 N/A
Isopropanol 67-63-0 100 0.0816 N/A
Water 7732-18-5 100 0.0816 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 3.1198 N/A
Non-hazardous base ingredient(s) Not Available 100 3.1197 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Gelling Agent Ammonium Chloride 12125-02-9 100 0.1851 N/A
Hydrotreated Kerosene 64742-47-8 100 0.1851 N/A
Water 7732-18-5 100 0.1851 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-04 2014-11-07 Surface Water - River 2530

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 713 0.0 0.0 0.0
2015 8510 0.0 0.0 0.0
2016 8512 0.0 0.0 0.0
2017 8384 0.0 0.0 0.0
2018 8573 0.0 0.0 0.0
2019 8541 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-29 No Incident Encountered 0.00 0.00
2014-11-25 No Incident Encountered 0.00 0.00
2014-11-02 No Incident Encountered 0.00 0.00
2019-08-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References