X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425080801000

Well Details

Well ID: 0425080801000
Loading map...
Location: 00/01-08-042-08W5/0
Location Alias: 00/01-08-42-08 W5M
Location Alias 2: 00/01-08-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 08
County/Municipality: Clearwater County
Well Name: PENN WEST HZ WILLGR 1-8-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0431523
License Date: 2011-02-14
License Status: Issued
Spud Date: 2011-09-01
Final Drill Date: 2011-09-24
Well Total Depth: 3383.00 m
Surface Hole Latitude: 52.611504
Surface Hole Longitude: -115.107711

For data sources see[1][2]

Well History

Date Event
2011-02-14 Obtained License
2011-09-04 Surface Casing Operation Performed
2011-09-05 Well Log Performed
2011-09-08 Direction Drilling Operation Performed - Horizontal
2011-09-12 Intermediate Casing Operation Performed
2011-09-24 Finished Drilling
2011-09-24 Well Mode changed to Drilled and Cased
2011-09-26 Liner Casing Operation Performed
2011-09-27 Rig Released
2011-09-27 Well Log Performed
2011-11-12 Well Log Performed
2011-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-01 Perforation Treatment Performed - Open-Hole Completion
2011-12-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-06 Well Began Production
2012-01-06 Well Fluid changed to Crude Oil
2012-01-06 Well Mode changed to Pumping
2012-01-16 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-08 1786.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-01 Open Hole/Barefoot Completion 3372.60 3383.00 0
2011-12-09 Multi-Stage Fracture 2995.60 2995.70 0
2011-12-11 Multi-Stage Fracture 2951.70 2951.80 0
2011-12-13 Multi-Stage Fracture 2907.20 2907.30 0
2011-12-13 Multi-Stage Fracture 2538.90 2539.00 0
2011-12-15 Multi-Stage Fracture 2507.50 2507.60 0
2011-12-16 Multi-Stage Fracture 2462.50 2462.60 0
2011-12-16 Multi-Stage Fracture 2429.90 2430.00 0
2011-12-16 Multi-Stage Fracture 2372.90 2373.00 0
2011-12-16 Multi-Stage Fracture 2328.70 2328.80 0
2011-12-16 Multi-Stage Fracture 2284.90 2285.00 0
2011-12-01 Multi-Stage Fracture 3338.00 3338.10 0
2011-12-03 Multi-Stage Fracture 3304.00 3304.10 0
2011-12-03 Multi-Stage Fracture 3256.40 3256.50 0
2011-12-05 Multi-Stage Fracture 3208.90 3209.00 0
2011-12-08 Multi-Stage Fracture 3174.80 3174.90 0
2011-12-09 Multi-Stage Fracture 3140.70 3140.80 0
2011-12-09 Multi-Stage Fracture 3070.60 3070.70 0
2011-12-09 Multi-Stage Fracture 3039.20 3039.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7117 0.0 0.0 0.0
2013 8482 0.0 0.0 0.0
2014 8564 0.0 0.0 0.0
2015 7957 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8670 0.0 0.0 0.0
2018 8573 0.0 0.0 0.0
2019 8573 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[6]

References