X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425073506000

Well Details

Well ID: 0425073506000
Loading map...
Location: 00/06-35-042-07W5/0
Location Alias: 00/06-35-42-07 W5M
Location Alias 2: 00/06-35-042-07 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 07
Section: 35
County/Municipality: Clearwater County
Well Name: PC WILLGR 6-35-42-7
Operator Name: Obsidian Energy Ltd.
License Number: 0082096
License Date: 1980-04-10
License Status: Abandoned
Spud Date: 1980-04-29
Final Drill Date: 1980-05-14
Well Total Depth: 1970.00 m
Surface Hole Latitude: 52.658988
Surface Hole Longitude: -114.905310

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-10 Obtained License
1980-05-14 Finished Drilling
1980-05-14 Well Mode changed to Drilled and Cased
1980-05-16 Production Casing Operation Performed
1980-08-05 Perforation Treatment Performed - Jet Perforation
1980-08-06 Perforation Treatment Performed - Fractured
1980-08-08 Perforation Treatment Performed - Fractured
1980-08-10 Perforation Treatment Performed - Jet Perforation
1980-08-11 Perforation Treatment Performed - Fractured
1980-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-30 Perforation Treatment Performed - Cement Squeeze
1980-11-20 Well Began Production
1980-11-20 Well Fluid changed to Crude Oil
1980-11-20 Well Mode changed to Flowing
1981-09-01 Well Fluid changed to Crude Oil
1981-09-01 Well Mode changed to Pumping
1994-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-22 Plug Back Performed
2002-05-22 Well Log Performed
2002-05-27 Perforation Treatment Performed - Jet Perforation
2002-05-27 Well Log Performed
2002-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-28 Perforation Treatment Performed - Remedial Casing
2002-05-31 Well Abandoned
2002-05-31 Well Fluid changed to Crude Oil
2002-05-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-05 Perforation 1944.00 1949.00 7
2002-05-27 Perforation 591.00 592.00 13
2002-05-28 Remedial Casing Cementing 591.00 592.00 0
2002-05-28 Packing Device Capped w/Cement 578.00 586.00 0
1980-08-06 Fracture 1944.00 1949.00 0
1980-08-08 Fracture 1944.00 1949.00 0
1980-08-10 Perforation 1538.00 1541.00 7
1980-08-11 Fracture 1538.00 1541.00 0
1980-10-29 Acid Treatment 1538.00 1541.00 0
1980-10-30 Cement Squeeze 1538.00 1541.00 0
1994-08-12 Acid Treatment 1944.00 1949.00 0
2002-05-22 Packing Device Capped w/Cement 1927.00 1935.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 840 0.0 0.0 0.0
1981 6269 0.0 0.0 0.0
1982 8088 0.0 0.0 0.0
1983 7872 0.0 0.0 0.0
1984 7848 0.0 0.0 0.0
1985 8112 0.0 0.0 0.0
1986 8591 0.0 0.0 0.0
1987 8736 0.0 0.0 0.0
1988 8447 0.0 0.0 0.0
1989 8712 0.0 0.0 0.0
1990 7724 0.0 0.0 0.0
1991 8208 0.0 0.0 0.0
1992 7871 0.0 0.0 0.0
1993 6384 0.0 0.0 0.0
1994 8136 0.0 0.0 0.0
1995 2592 0.0 0.0 0.0

For data sources see[5]

References