If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425073004000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.624278,"lon":-114.976373,"icon":""}]} |
Location: 00/04-30-042-07W5/0 | |
Location Alias: 00/04-30-42-07 W5M | |
Location Alias 2: 00/04-30-042-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 07 | |
Section: 30 | |
County/Municipality: Clearwater County | |
Well Name: OBE 100 HZ WILLGR 4-30-42-7 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0491857 | |
License Date: 2018-11-06 | |
License Status: Amended | |
Spud Date: 2020-02-06 | |
Final Drill Date: 2020-02-18 | |
Well Total Depth: 4841.00 m | |
Surface Hole Latitude: 52.624278 | |
Surface Hole Longitude: -114.976373 |
Date | Event |
---|---|
2018-11-06 | Obtained License |
2020-02-06 | Drill To LD |
2020-02-07 | Surface Casing Operation Performed |
2020-02-09 | Direction Drilling Operation Performed - Deviate |
2020-02-10 | Intermediate Casing Operation Performed |
2020-02-12 | Direction Drilling Operation Performed - Horizontal |
2020-02-17 | Production Casing Operation Performed |
2020-02-18 | Finished Drilling |
2020-02-18 | Well Mode changed to Drilled and Cased |
2020-02-19 | Rig Released |
2020-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-03-14 | Well Began Production |
2020-03-14 | Well Fluid changed to Crude Oil |
2020-03-14 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2020-02-06 | Nabors Drilling Canada Limited | 26 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2020-02-09 | 1603.40 | Deviate (5 - 79 degrees) |
2020-02-12 | 2094.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2020-03-12 | Multi-Stage Fracture | 4810.20 | 4810.90 | 0 |
2020-03-13 | Multi-Stage Fracture | 4074.00 | 4074.70 | 0 |
2020-03-13 | Multi-Stage Fracture | 3986.60 | 3987.20 | 0 |
2020-03-13 | Multi-Stage Fracture | 3898.80 | 3899.40 | 0 |
2020-03-13 | Multi-Stage Fracture | 3810.90 | 3811.50 | 0 |
2020-03-13 | Multi-Stage Fracture | 3723.00 | 3723.60 | 0 |
2020-03-13 | Multi-Stage Fracture | 3635.00 | 3635.60 | 0 |
2020-03-13 | Multi-Stage Fracture | 3546.50 | 3547.80 | 0 |
2020-03-13 | Multi-Stage Fracture | 3459.20 | 3460.50 | 0 |
2020-03-13 | Multi-Stage Fracture | 3373.40 | 3374.60 | 0 |
2020-03-13 | Multi-Stage Fracture | 3287.40 | 3288.60 | 0 |
2020-03-12 | Multi-Stage Fracture | 4766.50 | 4767.10 | 0 |
2020-03-13 | Multi-Stage Fracture | 3202.50 | 3203.70 | 0 |
2020-03-13 | Multi-Stage Fracture | 3118.10 | 3119.30 | 0 |
2020-03-13 | Multi-Stage Fracture | 3033.20 | 3034.40 | 0 |
2020-03-13 | Multi-Stage Fracture | 2950.60 | 2951.80 | 0 |
2020-03-14 | Multi-Stage Fracture | 2864.80 | 2866.00 | 0 |
2020-03-14 | Multi-Stage Fracture | 2778.70 | 2780.00 | 0 |
2020-03-14 | Multi-Stage Fracture | 2692.70 | 2693.90 | 0 |
2020-03-14 | Multi-Stage Fracture | 2606.20 | 2607.40 | 0 |
2020-03-14 | Multi-Stage Fracture | 2522.70 | 2524.00 | 0 |
2020-03-14 | Multi-Stage Fracture | 2436.60 | 2437.80 | 0 |
2020-03-12 | Multi-Stage Fracture | 4681.90 | 4682.50 | 0 |
2020-03-14 | Multi-Stage Fracture | 2351.20 | 2352.40 | 0 |
2020-03-14 | Multi-Stage Fracture | 2265.30 | 2266.50 | 0 |
2020-03-14 | Multi-Stage Fracture | 2179.80 | 2181.00 | 0 |
2020-03-12 | Multi-Stage Fracture | 4596.60 | 4597.20 | 0 |
2020-03-12 | Multi-Stage Fracture | 4509.50 | 4510.10 | 0 |
2020-03-13 | Multi-Stage Fracture | 4422.50 | 4423.10 | 0 |
2020-03-13 | Multi-Stage Fracture | 4336.40 | 4337.00 | 0 |
2020-03-13 | Multi-Stage Fracture | 4248.50 | 4249.10 | 0 |
2020-03-13 | Multi-Stage Fracture | 4161.30 | 4161.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 289 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-02-19 | No Incident Encountered | 0.00 | 0.00 |
2020-04-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]