X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425072814003

Well Details

Well ID: 0425072814003
Loading map...
Location: 00/14-28-042-07W5/3
Location Alias: 00/14-28-42-07 W5M
Location Alias 2: 00/14-28-042-07 W5/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 07
Section: 28
County/Municipality: Clearwater County
Well Name: PC WILLGR 14-28-42-7
Operator Name: Obsidian Energy Ltd.
License Number: 0107978
License Date: 1984-06-29
License Status: Issued
Spud Date: 1984-07-09
Final Drill Date: 1984-07-28
Well Total Depth: 2526.00 m
Surface Hole Latitude: 52.650809
Surface Hole Longitude: -114.953149

For data sources see[1][2]

Well History

Date Event
1984-06-29 Obtained License
1984-07-12 Surface Casing Operation Performed
1984-07-28 Finished Drilling
1984-07-28 Well Log Performed
1984-07-28 Well Mode changed to Drilled and Cased
1984-07-29 Well Log Performed
1984-08-01 Drill Stem Test Performed
1984-08-03 Plug Back Performed
1984-08-04 Production Casing Operation Performed
1984-08-05 Rig Released
1985-05-22 Perforation Treatment Performed - Jet Perforation
1985-05-23 Perforation Treatment Performed - Fractured
1985-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-03 Plug Back Performed
1991-04-01 Perforation Treatment Performed - Jet Perforation
1991-04-03 Perforation Treatment Performed - Fractured
1991-04-08 Well Log Performed
1997-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-19 Plug Back Performed
1997-12-19 Well Log Performed
1997-12-20 Well Log Performed
1997-12-21 Perforation Treatment Performed - Jet Perforation
1998-01-08 Perforation Treatment Performed - Fractured
2011-06-16 Perforation Treatment Performed - Jet Perforation
2011-06-16 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-06-16 Plug Back Performed
2011-06-16 Well Log Performed
2011-06-20 Perforation Treatment Performed - Fractured
2011-07-10 Well Began Production
2011-07-10 Well Fluid changed to Crude Oil
2011-07-10 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-22 Perforation 2257.50 2262.00 13
2011-06-16 Perforation 1536.00 1540.50 13
2011-06-20 Fracture 1536.00 1540.50 0
1985-05-23 Fracture 2257.50 2262.00 0
1985-06-03 Packing Device Capped w/Cement 2236.00 2245.00 0
1991-04-01 Perforation 1946.00 1949.50 13
1991-04-03 Fracture 1946.00 1949.50 0
1997-12-19 Packing Device Capped w/Cement 1933.00 1941.00 0
1997-12-21 Perforation 1570.30 1573.00 17
1998-01-08 Fracture 1570.30 1573.00 0
2011-06-16 Packing Dev Cpd w/Res-Gyp Cem 1559.00 1562.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4019 0.0 0.0 0.0
2012 8432 0.0 0.0 0.0
2013 8014 0.0 0.0 0.0
2014 8700 0.0 0.0 0.0
2015 8532 0.0 0.0 0.0
2016 8551 0.0 0.0 0.0
2017 7845 0.0 0.0 0.0
2018 4001 0.0 0.0 0.0
2019 6779 0.0 0.0 0.0
2020 1248 0.0 0.0 0.0

For data sources see[5]

References