X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425072506000

Well Details

Well ID: 0425072506000
Loading map...
Location: 00/06-25-042-07W5/0
Location Alias: 00/06-25-42-07 W5M
Location Alias 2: 00/06-25-042-07 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 07
Section: 25
County/Municipality: Clearwater County
Well Name: ITERATION WILLGR 6-25-42-7
Operator Name: Gain Energy Ltd.
License Number: 0026731
License Date: 1964-08-31
License Status: Suspension
Spud Date: 1964-09-15
Final Drill Date: 1964-09-27
Well Total Depth: 2016.30 m
Surface Hole Latitude: 52.645066
Surface Hole Longitude: -114.880014

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-08-31 Obtained License
1964-09-27 Finished Drilling
1964-09-27 Well Mode changed to Drilled and Cased
1964-09-28 Production Casing Operation Performed
1964-10-01 Perforation Treatment Performed - Selective Jet Perforations
1964-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-08 Perforation Treatment Performed - Fractured
1964-10-16 Well Began Production
1964-10-16 Well Fluid changed to Crude Oil
1964-10-16 Well Mode changed to Flowing
1972-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-07 Perforation Treatment Performed - Fractured
1975-06-03 Well Fluid changed to Crude Oil
1975-06-03 Well Mode changed to Pumping
1977-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-25 Perforation Treatment Performed - Jet Perforation
1979-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-20 Well Fluid changed to Crude Oil
1990-03-20 Well Mode changed to Suspended
1990-11-01 Well Fluid changed to Crude Oil
1990-11-01 Well Mode changed to Pumping
1990-11-30 Well Fluid changed to Crude Oil
1990-11-30 Well Mode changed to Suspended
1995-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-27 Perforation Treatment Performed - Jet Perforation
1995-10-27 Plug Back Performed
1995-10-27 Well Fluid changed to Crude Oil
1995-10-27 Well Mode changed to Abandoned Zone
1995-10-30 Well Log Performed
2003-09-17 Perforation Treatment Performed - Jet Perforation
2003-09-19 Perforation Treatment Performed - Cement Squeeze
2003-09-25 Perforation Treatment Performed - Jet Perforation
2003-09-28 Perforation Treatment Performed - Fractured
2005-12-20 Perforation Treatment Performed - Cement Plug
2005-12-20 Plug Back Performed
2005-12-21 Perforation Treatment Performed - Jet Perforation
2005-12-22 Perforation Treatment Performed - Remedial Casing
2006-01-13 Perforation Treatment Performed - Jet Perforation
2006-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-10-01 Selective Jet Perforations 1993.70 1994.00 0
1979-07-26 Acid Treatment 1992.80 1994.30 0
1979-08-10 Acid Treatment 1992.80 1994.30 0
1980-02-27 Acid Treatment 1992.80 1994.30 0
1995-10-27 Packing Device Capped w/Cement 1977.00 1986.00 0
1995-10-27 Perforation 1505.70 1508.00 13
1995-10-27 Perforation 1498.40 1501.40 13
2003-09-17 Perforation 1545.00 1546.00 14
2003-09-17 Perforation 1460.00 1461.00 14
2003-09-19 Cement Squeeze 1460.00 1546.00 0
2003-09-25 Perforation 1498.40 1501.40 20
1964-10-01 Selective Jet Perforations 1994.00 1994.00 0
2003-09-28 Fracture 1498.40 1501.40 0
2005-12-20 Cement Plug 1408.00 1512.00 0
2005-12-21 Perforation 920.00 921.00 15
2005-12-21 Perforation 1019.00 1020.00 15
2005-12-22 Remedial Casing Cementing 920.00 921.00 0
2005-12-22 Remedial Casing Cementing 1019.00 1020.00 0
2006-01-13 Perforation 978.50 983.50 17
2006-03-21 Packing Device Capped w/Cement 967.00 975.00 0
2006-03-21 Packing Device Capped w/Cement 905.00 913.00 0
1964-10-01 Selective Jet Perforations 1994.30 1994.30 0
1964-10-08 Acid Treatment 1993.70 1994.30 0
1964-10-08 Fracture 1993.70 1994.30 0
1972-03-07 Acid Treatment 1993.70 1994.30 0
1972-03-07 Fracture 1993.70 1994.30 0
1977-07-26 Acid Treatment 1993.70 1994.30 0
1979-07-25 Perforation 1992.80 1994.00 8

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8274 0.0 0.0 0.0
1968 7837 0.0 0.0 0.0
1969 7005 0.0 0.0 0.0
1970 8380 0.0 0.0 0.0
1971 7912 0.0 0.0 0.0
1972 8048 0.0 0.0 0.0
1973 8520 0.0 0.0 0.0
1974 7388 0.0 0.0 0.0
1975 2972 0.0 0.0 0.0
1976 5793 0.0 0.0 0.0
1977 7642 0.0 0.0 0.0
1978 7260 0.0 0.0 0.0
1979 5037 0.0 0.0 0.0
1980 7549 0.0 0.0 0.0
1981 7565 0.0 0.0 0.0
1982 6998 0.0 0.0 0.0
1983 7461 0.0 0.0 0.0
1984 7245 0.0 0.0 0.0
1985 7399 0.0 0.0 0.0
1986 6976 0.0 0.0 0.0
1987 7358 0.0 0.0 0.0
1988 7854 0.0 0.0 0.0
1989 6589 0.0 0.0 0.0
1990 2272 0.0 0.0 0.0

For data sources see[5]

References