If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425070802000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.624349,"lon":-114.977449,"icon":""}]} |
Location: 00/02-08-042-07W5/0 | |
Location Alias: 00/02-08-42-07 W5M | |
Location Alias 2: 00/02-08-042-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 07 | |
Section: 08 | |
County/Municipality: Clearwater County | |
Well Name: OBE HZ WILLGR 2-8-42-7 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0490687 | |
License Date: 2018-08-30 | |
License Status: Amended | |
Spud Date: 2020-02-19 | |
Final Drill Date: 2020-03-02 | |
Well Total Depth: 4767.00 m | |
Surface Hole Latitude: 52.624349 | |
Surface Hole Longitude: -114.977449 |
Date | Event |
---|---|
2018-08-30 | Obtained License |
2020-02-19 | Drill To LD |
2020-02-20 | Surface Casing Operation Performed |
2020-02-21 | Direction Drilling Operation Performed - Deviate |
2020-02-24 | Intermediate Casing Operation Performed |
2020-02-25 | Direction Drilling Operation Performed - Horizontal |
2020-03-02 | Finished Drilling |
2020-03-02 | Production Casing Operation Performed |
2020-03-02 | Well Mode changed to Drilled and Cased |
2020-03-03 | Rig Released |
2020-03-03 | Well Began Production |
2020-03-03 | Well Fluid changed to Crude Oil |
2020-03-03 | Well Mode changed to Flowing |
2020-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2020-02-19 | Nabors Drilling Canada Limited | 26 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2020-02-21 | 709.80 | Deviate (5 - 79 degrees) |
2020-02-25 | 2091.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2020-03-14 | Multi-Stage Fracture | 4736.20 | 4736.80 | 0 |
2020-03-15 | Multi-Stage Fracture | 4094.40 | 4095.10 | 0 |
2020-03-15 | Multi-Stage Fracture | 4020.10 | 4020.70 | 0 |
2020-03-15 | Multi-Stage Fracture | 3944.40 | 3945.00 | 0 |
2020-03-15 | Multi-Stage Fracture | 3870.00 | 3870.70 | 0 |
2020-03-15 | Multi-Stage Fracture | 3795.30 | 3795.90 | 0 |
2020-03-15 | Multi-Stage Fracture | 3717.40 | 3718.00 | 0 |
2020-03-15 | Multi-Stage Fracture | 3638.80 | 3640.00 | 0 |
2020-03-15 | Multi-Stage Fracture | 3563.50 | 3564.70 | 0 |
2020-03-15 | Multi-Stage Fracture | 3488.60 | 3489.80 | 0 |
2020-03-15 | Multi-Stage Fracture | 3413.90 | 3415.20 | 0 |
2020-03-14 | Multi-Stage Fracture | 4696.30 | 4697.00 | 0 |
2020-03-15 | Multi-Stage Fracture | 3339.20 | 3340.50 | 0 |
2020-03-15 | Multi-Stage Fracture | 3264.40 | 3265.70 | 0 |
2020-03-15 | Multi-Stage Fracture | 3189.70 | 3190.90 | 0 |
2020-03-15 | Multi-Stage Fracture | 3115.00 | 3116.20 | 0 |
2020-03-15 | Multi-Stage Fracture | 3040.50 | 3041.70 | 0 |
2020-03-15 | Multi-Stage Fracture | 2965.80 | 2967.00 | 0 |
2020-03-15 | Multi-Stage Fracture | 2891.20 | 2892.40 | 0 |
2020-03-15 | Multi-Stage Fracture | 2816.30 | 2817.50 | 0 |
2020-03-16 | Multi-Stage Fracture | 2741.70 | 2742.90 | 0 |
2020-03-16 | Multi-Stage Fracture | 2667.30 | 2668.50 | 0 |
2020-03-14 | Multi-Stage Fracture | 4622.10 | 4622.70 | 0 |
2020-03-16 | Multi-Stage Fracture | 2592.70 | 2593.90 | 0 |
2020-03-16 | Multi-Stage Fracture | 2517.80 | 2519.00 | 0 |
2020-03-16 | Multi-Stage Fracture | 2433.40 | 2434.60 | 0 |
2020-03-16 | Multi-Stage Fracture | 2347.40 | 2348.60 | 0 |
2020-03-16 | Multi-Stage Fracture | 2261.00 | 2262.20 | 0 |
2020-03-16 | Multi-Stage Fracture | 2174.60 | 2175.80 | 0 |
2020-03-15 | Multi-Stage Fracture | 4544.60 | 4545.20 | 0 |
2020-03-15 | Multi-Stage Fracture | 4470.10 | 4470.70 | 0 |
2020-03-15 | Multi-Stage Fracture | 4395.30 | 4396.00 | 0 |
2020-03-15 | Multi-Stage Fracture | 4320.10 | 4320.70 | 0 |
2020-03-15 | Multi-Stage Fracture | 4245.40 | 4246.10 | 0 |
2020-03-15 | Multi-Stage Fracture | 4169.50 | 4170.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 121 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-03-03 | No Incident Encountered | 0.00 | 0.00 |
2020-03-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]