X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425062006000

Well Details

Well ID: 0425062006000
Loading map...
Location: 00/06-20-042-06W5/0
Location Alias: 00/06-20-42-06 W5M
Location Alias 2: 00/06-20-042-06 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 06
Section: 20
County/Municipality: Clearwater County
Well Name: PC CROWN CE WILLGR 6-20-42-6
Operator Name: Obsidian Energy Ltd.
License Number: 0020268
License Date: 1961-01-13
License Status: Suspension
Spud Date: 1961-05-23
Final Drill Date: 1961-06-06
Well Total Depth: 1926.30 m
Surface Hole Latitude: 52.630253
Surface Hole Longitude: -114.832288

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-01-13 Obtained License
1961-06-06 Finished Drilling
1961-06-06 Well Mode changed to Drilled and Cased
1961-06-08 Perforation Treatment Performed - Jet Perforation
1961-06-08 Production Casing Operation Performed
1961-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-15 Perforation Treatment Performed - Fractured
1961-06-22 Well Began Production
1961-06-22 Well Fluid changed to Crude Oil
1961-06-22 Well Mode changed to Flowing
1970-09-01 Well Fluid changed to Crude Oil
1970-09-01 Well Mode changed to Pumping
1981-07-07 Perforation Treatment Performed - Fractured
1981-07-08 Perforation Treatment Performed - Fractured
1986-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-12 Well Log Performed
2001-05-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-13 Well Fluid changed to Crude Oil
2001-05-13 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-08 Perforation 1907.40 1908.70 7
1961-06-08 Perforation 1909.30 1909.60 7
1961-06-15 Acid Treatment 1907.40 1909.60 0
1961-06-15 Fracture 1907.40 1909.60 0
1981-07-07 Fracture 1907.40 1909.60 0
1981-07-08 Fracture 1907.40 1909.60 0
1986-08-02 Acid Treatment 1907.40 1909.60 0
2001-05-13 Packing Device Capped w/Cement 1883.50 1898.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3502 0.0 0.0 0.0
1968 3817 0.0 0.0 0.0
1969 3521 0.0 0.0 0.0
1970 4632 0.0 0.0 0.0
1971 7111 0.0 0.0 0.0
1972 8690 0.0 0.0 0.0
1973 8584 0.0 0.0 0.0
1974 8735 0.0 0.0 0.0
1975 8759 0.0 0.0 0.0
1976 8603 0.0 0.0 0.0
1977 8735 0.0 0.0 0.0
1978 8543 0.0 0.0 0.0
1979 8687 0.0 0.0 0.0
1980 8375 0.0 0.0 0.0
1981 7151 0.0 0.0 0.0
1982 8423 0.0 0.0 0.0
1983 8595 0.0 0.0 0.0
1984 8759 0.0 0.0 0.0
1985 8111 0.0 0.0 0.0
1986 7751 0.0 0.0 0.0
1987 8064 0.0 0.0 0.0
1988 8568 0.0 0.0 0.0
1989 8735 0.0 0.0 0.0
1990 8605 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8544 0.0 0.0 0.0
1994 8616 0.0 0.0 0.0
1995 8663 0.0 0.0 0.0
1996 8456 0.0 0.0 0.0
1997 8423 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 744 0.0 0.0 0.0
2001 1 0.0 0.0 0.0

For data sources see[5]

References