X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425053307000

Well Details

Well ID: 0425053307000
Loading map...
Location: 00/07-33-042-05W5/0
Location Alias: 00/07-33-42-05 W5M
Location Alias 2: 00/07-33-042-05 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 05
Section: 33
County/Municipality: Clearwater County
Well Name: ESSO OPEN CREEK 7-33-42-5
Operator Name: Imperial Oil Resources Limited
License Number: 0048231
License Date: 1973-12-05
License Status: RecCertified
Spud Date: 1973-12-23
Final Drill Date: 1974-01-18
Well Total Depth: 2310.40 m
Surface Hole Latitude: 52.658247
Surface Hole Longitude: -114.656848

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-12-05 Obtained License
1974-01-09 Drill Stem Test Performed
1974-01-14 Drill Stem Test Performed
1974-01-16 Drill Stem Test Performed
1974-01-18 Finished Drilling
1974-01-18 Well Mode changed to Drilled and Cased
1974-01-20 Drill Stem Test Performed
1974-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-25 Perforation Treatment Performed - Jet Perforation
1974-01-26 Well Began Production
1974-01-26 Well Fluid changed to Crude Oil
1974-01-26 Well Mode changed to Flowing
1974-10-21 Well Fluid changed to Crude Oil
1974-10-21 Well Mode changed to Pumping
1980-12-01 Well Fluid changed to Crude Oil
1980-12-01 Well Mode changed to Suspended
1992-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-15 Perforation Treatment Performed - Jet Perforation
1992-09-15 Plug Back Performed
1992-09-15 Well Fluid changed to Crude Oil
1992-09-15 Well Log Performed
1992-09-15 Well Mode changed to Abandoned
1992-09-16 Perforation Treatment Performed - Remedial Casing
1992-09-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-01-25 Perforation 2251.30 2251.60 3
1974-01-25 Perforation 2252.50 2252.50 3
1974-01-25 Perforation 2253.70 2253.70 3
1974-01-25 Perforation 2254.60 2256.40 3
1974-01-25 Acid Treatment 2251.30 2256.40 0
1992-09-15 Packing Device Capped w/Cement 2229.00 2237.00 0
1992-09-15 Perforation 410.00 410.40 7
1992-09-16 Remedial Casing Cementing 410.00 410.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1055 0.0 0.0 0.0
1975 1420 0.0 0.0 0.0
1976 2397 0.0 0.0 0.0
1977 1604 0.0 0.0 0.0
1978 2008 0.0 0.0 0.0
1979 4717 0.0 0.0 0.0
1980 4046 0.0 0.0 0.0

For data sources see[5]

References