X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425052310002

Well Details

Well ID: 0425052310002
Loading map...
Location: 00/10-23-042-05W5/2
Location Alias: 00/10-23-42-05 W5M
Location Alias 2: 00/10-23-042-05 W5/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 05
Section: 23
County/Municipality: Ponoka County
Well Name: OEI WILLGR 10-23-42-5
Operator Name: Gain Energy Ltd.
License Number: 0030973
License Date: 1966-09-14
License Status: Issued
Spud Date: 1966-09-21
Final Drill Date: 1966-10-12
Well Total Depth: 2255.50 m
Surface Hole Latitude: 52.634156
Surface Hole Longitude: -114.610748

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-14 Obtained License
1966-10-12 Finished Drilling
1966-10-14 Drill Stem Test Performed
1966-10-15 Drill Stem Test Performed
1966-10-18 Production Casing Operation Performed
1966-10-19 Perforation Treatment Performed - Acid Wash - No Pressure
1966-10-19 Perforation Treatment Performed - Jet Perforation
1966-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-11-08 Perforation Treatment Performed - Jet Perforation
1966-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-11 Perforation Treatment Performed - Fractured
1966-11-21 Perforation Treatment Performed - Cement Squeeze
1966-11-22 Perforation Treatment Performed - Jet Perforation
1966-11-24 Perforation Treatment Performed - Acid Wash - No Pressure
1966-11-24 Perforation Treatment Performed - Fractured
1984-12-17 Perforation Treatment Performed - Cement Squeeze
1984-12-17 Plug Back Performed
1985-01-08 Perforation Treatment Performed - Jet Perforation
1985-01-17 Well Mode changed to Drilled and Cased
1985-03-28 Well Began Production
1985-03-28 Well Fluid changed to Gas
1985-03-28 Well Mode changed to Flowing
1988-04-10 Perforation Treatment Performed - Jet Perforation
1988-04-10 Well Log Performed
1988-04-11 Perforation Treatment Performed - Fractured
1988-05-31 Well Fluid changed to Gas
1988-05-31 Well Mode changed to Suspended
1991-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-12-13 Plug Back Performed
1991-12-14 Perforation Treatment Performed - Jet Perforation
1991-12-21 Well Log Performed
1992-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-01-28 Plug Back Performed
1992-01-30 Perforation Treatment Performed - Jet Perforation
1992-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-07 Plug Back Performed
1992-02-07 Well Fluid changed to Gas
1992-02-07 Well Mode changed to Abandoned and Re-entered
1992-02-11 Perforation Treatment Performed - Jet Perforation
1992-02-11 Perforation Treatment Performed - Remedial Casing
1992-02-19 Well Abandoned
1994-10-27 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-19 Perforation 2226.00 2226.90 3
1966-11-22 Perforation 1312.50 1316.10 0
1966-11-24 Acid Wash 1312.50 1316.10 0
1966-11-24 Fracture 1312.50 1316.10 0
1984-12-17 Cement Squeeze 1312.50 1316.10 0
1985-01-08 Perforation 2226.00 2234.00 13
1988-04-10 Perforation 2225.60 2226.90 13
1988-04-10 Perforation 2228.10 2230.50 13
1988-04-10 Perforation 2231.00 2234.80 13
1988-04-11 Fracture 2225.60 2234.80 0
1991-12-13 Packing Device Capped w/Cement 2179.00 2187.00 0
1966-10-19 Perforation 2228.10 2230.50 3
1991-12-13 Packing Device Capped w/Cement 2127.00 2135.00 0
1991-12-14 Perforation 1871.50 1895.90 13
1992-01-28 Packing Device Capped w/Cement 1867.00 1871.00 0
1992-01-30 Perforation 1839.00 1860.00 13
1992-02-05 Acid Treatment 1839.00 1860.00 0
1992-02-07 Packing Device Capped w/Cement 1829.00 1837.00 0
1992-02-11 Perforation 437.00 438.00 10
1992-02-11 Remedial Casing Cementing 437.00 438.00 0
1966-10-19 Perforation 2231.40 2234.80 3
1966-10-19 Acid Wash 2226.00 2234.80 0
1966-11-08 Packing Device Capped w/Cement 2193.00 2193.00 0
1966-11-08 Perforation 2139.10 2142.10 3
1966-11-09 Acid Treatment 2139.10 2142.10 0
1966-11-11 Fracture 2139.10 2142.10 0
1966-11-21 Cement Squeeze 2139.10 2142.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3721 0.0 0.0 0.0
1986 3937 0.0 0.0 0.0
1987 1719 0.0 0.0 0.0
1988 1374 0.0 0.0 0.0

For data sources see[5]

References