If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425043001020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.643549,"lon":-114.595389,"icon":""}]} |
Location: 02/01-30-042-04W5/0 | |
Location Alias: 02/01-30-42-04 W5M | |
Location Alias 2: 02/01-30-042-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 04 | |
Section: 30 | |
County/Municipality: Ponoka County | |
Well Name: TQN HZ PEMBINA 1-30-42-4 | |
Operator Name: TAQA North Ltd. | |
License Number: 0496474 | |
License Date: 2019-11-19 | |
License Status: Issued | |
Spud Date: 2020-01-04 | |
Final Drill Date: 2020-01-14 | |
Well Total Depth: 4004.00 m | |
Surface Hole Latitude: 52.643549 | |
Surface Hole Longitude: -114.595389 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2020-01-04 | Nabors Drilling Limited | 11 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2020-01-07 | 1026.50 | Deviate (5 - 79 degrees) |
2020-01-08 | 1466.70 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2020-01-16 | Open Hole/Barefoot Completion | 4001.00 | 4004.00 | 0 |
2020-02-12 | Multi-Stage Fracture | 3464.90 | 3465.90 | 0 |
2020-02-12 | Multi-Stage Fracture | 3396.60 | 3397.30 | 0 |
2020-02-12 | Multi-Stage Fracture | 3328.40 | 3329.10 | 0 |
2020-02-12 | Multi-Stage Fracture | 3260.10 | 3260.80 | 0 |
2020-02-12 | Multi-Stage Fracture | 3191.80 | 3192.50 | 0 |
2020-02-12 | Multi-Stage Fracture | 3124.40 | 3125.10 | 0 |
2020-02-12 | Multi-Stage Fracture | 3056.20 | 3056.90 | 0 |
2020-02-12 | Multi-Stage Fracture | 2987.90 | 2988.60 | 0 |
2020-02-12 | Multi-Stage Fracture | 2919.70 | 2920.30 | 0 |
2020-02-12 | Multi-Stage Fracture | 2851.40 | 2852.00 | 0 |
2020-02-12 | Multi-Stage Fracture | 3971.20 | 3972.30 | 0 |
2020-02-12 | Multi-Stage Fracture | 2783.10 | 2783.80 | 0 |
2020-02-12 | Multi-Stage Fracture | 2714.80 | 2715.50 | 0 |
2020-02-12 | Multi-Stage Fracture | 2580.50 | 2581.20 | 0 |
2020-02-12 | Multi-Stage Fracture | 2547.40 | 2648.10 | 0 |
2020-02-12 | Multi-Stage Fracture | 2512.20 | 2512.90 | 0 |
2020-02-12 | Multi-Stage Fracture | 2444.00 | 2444.60 | 0 |
2020-02-12 | Multi-Stage Fracture | 2375.70 | 2376.30 | 0 |
2020-02-13 | Multi-Stage Fracture | 2308.00 | 2308.70 | 0 |
2020-02-13 | Multi-Stage Fracture | 2307.40 | 2308.10 | 0 |
2020-02-13 | Multi-Stage Fracture | 2239.70 | 2240.40 | 0 |
2020-02-12 | Multi-Stage Fracture | 3942.80 | 3943.50 | 0 |
2020-02-13 | Multi-Stage Fracture | 2239.10 | 2239.80 | 0 |
2020-02-13 | Multi-Stage Fracture | 2171.50 | 2172.20 | 0 |
2020-02-13 | Multi-Stage Fracture | 2170.90 | 2171.50 | 0 |
2020-02-13 | Multi-Stage Fracture | 2102.60 | 2103.40 | 0 |
2020-02-13 | Multi-Stage Fracture | 2034.30 | 2035.00 | 0 |
2020-02-13 | Multi-Stage Fracture | 1966.10 | 1966.80 | 0 |
2020-02-13 | Multi-Stage Fracture | 1897.80 | 1898.50 | 0 |
2020-02-13 | Multi-Stage Fracture | 1624.70 | 1625.40 | 0 |
2020-02-13 | Multi-Stage Fracture | 1556.40 | 1557.10 | 0 |
2020-02-12 | Multi-Stage Fracture | 3874.50 | 3875.20 | 0 |
2020-02-12 | Multi-Stage Fracture | 3806.20 | 3806.90 | 0 |
2020-02-12 | Multi-Stage Fracture | 3738.00 | 3738.60 | 0 |
2020-02-12 | Multi-Stage Fracture | 3669.70 | 3670.40 | 0 |
2020-02-12 | Multi-Stage Fracture | 3601.40 | 3602.10 | 0 |
2020-02-12 | Multi-Stage Fracture | 3533.20 | 3533.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 327 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-01-16 | No Incident Encountered | 0.00 | 0.00 |
2020-02-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]