If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425041701000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.62183,"lon":-114.537556,"icon":""}]} |
Location: 00/01-17-042-04W5/0 | |
Location Alias: 00/01-17-42-04 W5M | |
Location Alias 2: 00/01-17-042-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 04 | |
Section: 17 | |
County/Municipality: Ponoka County | |
Well Name: PW GAS GILBY 1-17-42-4 | |
Operator Name: TAQA North Ltd. | |
License Number: 0226331 | |
License Date: 1999-09-14 | |
License Status: Abandoned | |
Spud Date: 1999-09-24 | |
Final Drill Date: 1999-10-27 | |
Well Total Depth: 3060.00 m | |
Surface Hole Latitude: 52.621830 | |
Surface Hole Longitude: -114.537556 |
Date | Event |
---|---|
1999-09-14 | Obtained License |
1999-09-26 | Surface Casing Operation Performed |
1999-09-30 | Direction Drilling Operation Performed - Horizontal |
1999-10-08 | Production Casing Operation Performed |
1999-10-27 | Finished Drilling |
1999-10-27 | Well Log Performed |
1999-10-28 | Liner Casing Operation Performed |
1999-10-28 | Perforation Treatment Performed - Slotted Liner or Casing |
1999-10-28 | Well Log Performed |
1999-10-29 | Rig Released |
1999-10-29 | Well Log Performed |
1999-10-29 | Well Mode changed to Drilled and Cased |
1999-11-03 | Well Log Performed |
1999-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-09-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-04 | Plug Back Performed |
2010-09-04 | Well Mode changed to Abandoned Zone |
2010-09-05 | Well Log Performed |
2010-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-11 | Perforation Treatment Performed - Jet Perforation |
2010-09-11 | Well Log Performed |
2010-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-12 | Perforation Treatment Performed - Cement Squeeze |
2010-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-13 | Well Log Performed |
2010-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-14 | Perforation Treatment Performed - Cement Squeeze |
2010-09-14 | Perforation Treatment Performed - Jet Perforation |
2010-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-18 | Perforation Treatment Performed - Cement Squeeze |
2010-09-18 | Perforation Treatment Performed - Jet Perforation |
2010-09-19 | Perforation Treatment Performed - Jet Perforation |
2010-09-19 | Well Log Performed |
2010-09-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-24 | Perforation Treatment Performed - Cement Squeeze |
2010-09-25 | Perforation Treatment Performed - Cement Squeeze |
2010-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-27 | Perforation Treatment Performed - Jet Perforation |
2010-09-27 | Well Log Performed |
2010-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-09-30 | Perforation Treatment Performed - Cement Squeeze |
2010-10-06 | Perforation Treatment Performed - Jet Perforation |
2010-10-06 | Well Log Performed |
2010-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-08 | Perforation Treatment Performed - Cement Squeeze |
2010-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-09 | Well Log Performed |
2010-10-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-10 | Perforation Treatment Performed - Cement Squeeze |
2010-10-20 | Well Abandoned |
2010-10-20 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-09-30 | 2001.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-10-28 | Slotted Liner | 2148.30 | 3060.00 | 0 |
2010-09-14 | Perforation | 890.00 | 891.00 | 17 |
2010-09-14 | Cement Squeeze | 890.00 | 891.00 | 0 |
2010-09-14 | Packing Device Capped w/Cement | 876.00 | 883.20 | 0 |
2010-09-16 | Packing Device Capped w/Cement | 811.00 | 815.00 | 0 |
2010-09-18 | Perforation | 809.00 | 810.00 | 17 |
2010-09-18 | Cement Squeeze | 809.00 | 810.00 | 0 |
2010-09-18 | Packing Device Capped w/Cement | 797.00 | 805.00 | 0 |
2010-09-19 | Perforation | 750.00 | 751.00 | 17 |
2010-09-19 | Perforation | 609.00 | 610.00 | 17 |
2010-09-24 | Cement Squeeze | 750.00 | 751.00 | 0 |
1999-11-09 | Acid Treatment | 2148.30 | 3060.00 | 0 |
2010-09-24 | Packing Device Capped w/Cement | 723.00 | 747.00 | 0 |
2010-09-25 | Cement Squeeze | 609.00 | 610.00 | 0 |
2010-09-26 | Packing Device Capped w/Cement | 610.00 | 615.00 | 0 |
2010-09-26 | Packing Device Capped w/Cement | 595.00 | 604.00 | 0 |
2010-09-27 | Perforation | 585.00 | 586.00 | 17 |
2010-09-27 | Perforation | 479.00 | 480.00 | 17 |
2010-09-30 | Cement Squeeze | 585.00 | 586.00 | 0 |
2010-09-30 | Packing Device Capped w/Cement | 574.00 | 582.50 | 0 |
2010-10-06 | Perforation | 530.00 | 531.00 | 17 |
2010-10-08 | Cement Squeeze | 530.00 | 531.00 | 0 |
1999-11-15 | Acid Treatment | 2148.30 | 3060.00 | 0 |
2010-10-08 | Packing Device Capped w/Cement | 519.00 | 527.30 | 0 |
2010-10-09 | Packing Device Capped w/Cement | 480.00 | 485.30 | 0 |
2010-10-10 | Cement Squeeze | 479.00 | 480.00 | 0 |
2010-10-10 | Packing Device Capped w/Cement | 457.00 | 475.00 | 0 |
2010-09-04 | Packing Device Capped w/Cement | 2048.00 | 2148.00 | 0 |
2010-09-11 | Packing Device Capped w/Cement | 1121.00 | 1125.00 | 0 |
2010-09-11 | Perforation | 1120.00 | 1121.00 | 17 |
2010-09-12 | Cement Squeeze | 1120.00 | 1121.00 | 0 |
2010-09-12 | Packing Device Capped w/Cement | 1108.00 | 1116.50 | 0 |
2010-09-13 | Packing Device Capped w/Cement | 891.00 | 900.30 | 0 |
For data sources see[5]