X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425040301030

Well Details

Well ID: 0425040301030
Loading map...
Location: 03/01-03-042-04W5/0
Location Alias: 03/01-03-42-04 W5M
Location Alias 2: 03/01-03-042-04 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 03
County/Municipality: Ponoka County
Well Name: BEC HZ GILBY 1-3-42-4
Operator Name: Bonavista Energy Corporation
License Number: 0475017
License Date: 2015-03-19
License Status: Issued
Spud Date: 2015-04-29
Final Drill Date: 2015-05-08
Well Total Depth: 3802.00 m
Surface Hole Latitude: 52.583212
Surface Hole Longitude: -114.510553

For data sources see[1][2]

Well History

Date Event
2015-03-19 Obtained License
2015-04-29 Surface Casing Operation Performed
2015-05-01 Direction Drilling Operation Performed - Deviate
2015-05-03 Direction Drilling Operation Performed - Horizontal
2015-05-04 Intermediate Casing Operation Performed
2015-05-08 Finished Drilling
2015-05-08 Well Log Performed
2015-05-08 Well Mode changed to Drilled and Cased
2015-05-10 Liner Casing Operation Performed
2015-05-10 Perforation Treatment Performed - Open-Hole Completion
2015-05-10 Rig Released
2015-05-14 Well Log Performed
2015-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-05-19 Well Fluid changed to Gas
2015-05-19 Well Mode changed to Testing
2015-05-26 Well Began Production
2015-05-26 Well Fluid changed to Gas
2015-05-26 Well Mode changed to Flowing
2016-11-03 Well Fluid changed to Gas
2016-11-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-04-29 Savanna Drilling Corp. 631 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-05-01 1631.20 Deviate (5 - 79 degrees)
2015-05-03 2313.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-05-10 Open Hole/Barefoot Completion 3799.00 3802.00 0
2015-05-17 Multi-Stage Fracture 2799.10 2799.20 0
2015-05-17 Multi-Stage Fracture 2649.80 2649.90 0
2015-05-17 Multi-Stage Fracture 2567.30 2567.40 0
2015-05-17 Multi-Stage Fracture 2445.00 2445.10 0
2015-05-17 Multi-Stage Fracture 3776.20 3776.30 0
2015-05-17 Multi-Stage Fracture 3683.90 3684.00 0
2015-05-17 Multi-Stage Fracture 3561.50 3561.60 0
2015-05-17 Multi-Stage Fracture 3438.70 3438.80 0
2015-05-17 Multi-Stage Fracture 3302.80 3302.90 0
2015-05-17 Multi-Stage Fracture 3180.10 3180.20 0
2015-05-17 Multi-Stage Fracture 3057.70 3057.80 0
2015-05-17 Multi-Stage Fracture 2921.60 2921.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-05-17 2015-05-17 2,107 672 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 19.7287 N/A
Water Not Available 100 41.5812 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 37.4852 N/A
OG-6BL Sanjel Breaker Magnesium Oxide 1309-48-4 100 0.0432 N/A
Non-Hazardous Ingredients Not Available 100 0.0432 N/A
BUFFER-A Sanjel Buffer Acetic Acid 64-19-7 100 0.0848 N/A
Water Not Available 100 0.0848 N/A
SI-15W Sanjel Scale Inhibitor Ethylene Glycol 107-21-1 100 0.0095 N/A
Methanol 67-56-1 100 0.0095 N/A
Non-Hazardous Ingredient Not Available 100 0.0095 N/A
CG-5 Sanjel Surfactant Amines. C14-18; C16-18-Unsat. Alkyl. Ethoxylated 68155-39-5 100 1.0671 N/A
Ethanol. 2. 2'-(Octadecylamino) bis- 10213-78-2 100 1.0671 N/A
Hydrochloric Acid 7647-01-0 100 1.0671 N/A
Isopropanol 67-63-0 100 1.0671 N/A
Sodium xylenesulfonate 1300-72-7 100 1.0671 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-05-14 2015-06-15 Surface Water - Runoff 750

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 5315 0.0 0.0 0.0
2016 8780 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-08 No Incident Encountered 0.00 0.00
2015-05-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References