X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425033412000

Well Details

Well ID: 0425033412000
Loading map...
Location: 00/12-34-042-03W5/0
Location Alias: 00/12-34-42-03 W5M
Location Alias 2: 00/12-34-042-03 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 03
Section: 34
County/Municipality: Ponoka County
Well Name: BONAVISTA WILSONCK 12-34-42-3
Operator Name: Bonavista Energy Corporation
License Number: 0329832
License Date: 2005-04-26
License Status: Suspension
Spud Date: 2005-05-15
Final Drill Date: 2005-05-16
Well Total Depth: 1373.00 m
Surface Hole Latitude: 52.662384
Surface Hole Longitude: -114.348074

For data sources see[1][2]

Well History

Date Event
2005-04-26 Obtained License
2005-05-15 Direction Drilling Operation Performed - Deviate
2005-05-15 Surface Casing Operation Performed
2005-05-16 Finished Drilling
2005-05-16 Well Mode changed to Drilled and Cased
2005-05-17 Production Casing Operation Performed
2005-05-17 Rig Released
2005-05-17 Well Log Performed
2005-06-05 Perforation Treatment Performed - Jet Perforation
2005-06-05 Well Log Performed
2005-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-24 Plug Back Performed
2005-06-24 Well Mode changed to Abandoned Zone
2005-06-25 Perforation Treatment Performed - Jet Perforation
2005-07-03 Perforation Treatment Performed - Fractured
2005-08-01 Perforation Treatment Performed - Jet Perforation
2005-08-23 Perforation Treatment Performed - Jet Perforation
2005-08-28 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-05-15 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-05 Perforation 1178.50 1182.50 13
2005-06-24 Packing Device Capped w/Cement 1167.00 1175.00 0
2005-06-25 Perforation 996.00 997.50 13
2005-07-03 Fracture 996.00 997.50 0
2005-08-01 Perforation 802.70 803.70 13
2005-08-23 Perforation 772.50 773.50 13
2005-08-28 Fracture 772.50 773.50 0

For data sources see[5]



References