X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425032014000

Well Details

Well ID: 0425032014000
Loading map...
Location: 00/14-20-042-03W5/0
Location Alias: 00/14-20-42-03 W5M
Location Alias 2: 00/14-20-042-03 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 03
Section: 20
County/Municipality: Ponoka County
Well Name: JOURNEY PEMBINA 14-20-42-3
Operator Name: Journey Energy Inc.
License Number: 0432006
License Date: 2011-03-02
License Status: Issued
Spud Date: 2011-05-14
Final Drill Date: 2011-05-29
Well Total Depth: 3486.00 m
Surface Hole Latitude: 52.625775
Surface Hole Longitude: -114.399467

For data sources see[1][2]

Well History

Date Event
2011-03-02 Obtained License
2011-05-15 Surface Casing Operation Performed
2011-05-17 Direction Drilling Operation Performed - Horizontal
2011-05-24 Intermediate Casing Operation Performed
2011-05-24 Well Log Performed
2011-05-29 Finished Drilling
2011-05-29 Well Mode changed to Drilled and Cased
2011-06-03 Liner Casing Operation Performed
2011-06-04 Rig Released
2011-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-04 Well Began Production
2011-08-04 Well Fluid changed to Gas
2011-08-04 Well Mode changed to Flowing
2014-04-01 Well Fluid changed to Gas
2014-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-05-17 1017.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-06-25 Multi-Stage Fracture 3457.30 3457.40 0
2011-06-25 Multi-Stage Fracture 2244.80 2244.90 0
2011-06-25 Multi-Stage Fracture 3338.60 3338.70 0
2011-06-25 Multi-Stage Fracture 3213.30 3213.40 0
2011-06-25 Multi-Stage Fracture 3047.80 3047.90 0
2011-06-25 Multi-Stage Fracture 2895.80 2895.90 0
2011-06-25 Multi-Stage Fracture 2730.40 2730.50 0
2011-06-25 Multi-Stage Fracture 2631.80 2631.90 0
2011-06-25 Multi-Stage Fracture 2480.10 2480.20 0
2011-06-25 Multi-Stage Fracture 2328.10 2328.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3460 0.0 0.0 0.0
2012 8708 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8495 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8725 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8423 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References