X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425023501000

Well Details

Well ID: 0425023501000
Loading map...
Location: 00/01-35-042-02W5/0
Location Alias: 00/01-35-42-02 W5M
Location Alias 2: 00/01-35-042-02 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 02
Section: 35
County/Municipality: Ponoka County
Well Name: SHELL RIMBEY NO. B-1-35
Operator Name: Shell Canada Limited
License Number: 0008287
License Date: 1954-07-27
License Status: RecCertified
Spud Date: 1954-07-27
Final Drill Date: 1954-09-20
Well Total Depth: 2437.80 m
Surface Hole Latitude: 52.656021
Surface Hole Longitude: -114.172843

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-07-27 Obtained License
1954-09-13 Drill Stem Test Performed
1954-09-16 Production Casing Operation Performed
1954-09-20 Finished Drilling
1954-09-20 Perforation Treatment Performed - Open-Hole Completion
1954-09-20 Well Mode changed to Drilled and Cased
1954-09-21 Drill Stem Test Performed
1954-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-09-23 Perforation Treatment Performed - Jet Perforation
1954-09-26 Well Began Production
1954-09-26 Well Fluid changed to Crude Oil
1954-09-26 Well Mode changed to Flowing
1965-04-03 Perforation Treatment Performed - Condensate Squeeze
1965-08-24 Perforation Treatment Performed - Jet Perforation
1965-11-16 Well Fluid changed to Crude Oil
1965-11-16 Well Mode changed to Pumping
1967-04-05 Well Fluid changed to Crude Oil
1967-04-05 Well Mode changed to Suspended
1973-11-05 Perforation Treatment Performed - Cement Plug
1974-08-13 Well Abandoned
1974-08-13 Well Fluid changed to Crude Oil
1974-08-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-09-20 Open Hole/Barefoot Completion 2435.40 2437.80 0
1954-09-23 Perforation 2435.70 2437.50 10
1954-09-23 Acid Treatment 2435.70 2437.50 0
1965-04-03 Condensate Squeeze 2435.70 2437.50 0
1965-08-24 Perforation 2431.70 2433.20 13
1973-11-05 Cement Plug 2306.70 2436.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References