X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425022507000

Well Details

Well ID: 0425022507000
Loading map...
Location: 00/07-25-042-02W5/0
Location Alias: 00/07-25-42-02 W5M
Location Alias 2: 00/07-25-042-02 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 02
Section: 25
County/Municipality: Ponoka County
Well Name: CALMONT RIMBEY NO. 1
Operator Name: Shell Canada Limited
License Number: 0005779
License Date: 1952-12-08
License Status: RecCertified
Spud Date: 1953-01-06
Final Drill Date: 1953-05-04
Well Total Depth: 2453.30 m
Surface Hole Latitude: 52.645172
Surface Hole Longitude: -114.154802

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-08 Obtained License
1953-01-12 Drill Stem Test Performed
1953-01-15 Drill Stem Test Performed
1953-01-31 Drill Stem Test Performed
1953-02-01 Drill Stem Test Performed
1953-02-04 Drill Stem Test Performed
1953-02-05 Drill Stem Test Performed
1953-02-07 Drill Stem Test Performed
1953-02-10 Drill Stem Test Performed
1953-02-11 Drill Stem Test Performed
1953-02-23 Drill Stem Test Performed
1953-02-27 Drill Stem Test Performed
1953-03-07 Drill Stem Test Performed
1953-03-13 Drill Stem Test Performed
1953-03-19 Drill Stem Test Performed
1953-03-23 Drill Stem Test Performed
1953-04-11 Drill Stem Test Performed
1953-04-14 Liner Casing Operation Performed
1953-04-21 Drill Stem Test Performed
1953-04-22 Drill Stem Test Performed
1953-04-23 Drill Stem Test Performed
1953-04-25 Drill Stem Test Performed
1953-04-26 Drill Stem Test Performed
1953-04-29 Drill Stem Test Performed
1953-04-30 Drill Stem Test Performed
1953-05-01 Drill Stem Test Performed
1953-05-02 Drill Stem Test Performed
1953-05-04 Finished Drilling
1953-05-04 Well Mode changed to Drilled and Cased
1953-05-09 Perforation Treatment Performed - Jet Perforation
1953-05-12 Perforation Treatment Performed - Acid Wash - No Pressure
1953-05-13 Well Began Production
1953-05-13 Well Fluid changed to Crude Oil
1953-05-13 Well Mode changed to Flowing
1963-06-19 Perforation Treatment Performed - Cement Squeeze
1963-06-21 Perforation Treatment Performed - Jet Perforation
1963-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-27 Well Fluid changed to Crude Oil
1964-02-27 Well Mode changed to Pumping
1965-11-16 Well Fluid changed to Crude Oil
1965-11-16 Well Mode changed to Flowing
1967-04-05 Well Fluid changed to Crude Oil
1967-04-05 Well Mode changed to Suspended
1973-10-03 Perforation Treatment Performed - Cement Plug
1973-10-03 Well Abandoned
1973-10-03 Well Fluid changed to Crude Oil
1973-10-03 Well Mode changed to Abandoned
1973-10-18 Perforation Treatment Performed - Cement Plug
1973-10-19 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-05-09 Perforation 2440.80 2441.40 33
1953-05-12 Acid Wash 2440.80 2441.40 0
1963-06-19 Cement Squeeze 2440.80 2441.40 0
1963-06-21 Perforation 2437.20 2438.10 13
1963-06-22 Acid Treatment 2437.20 2438.10 0
1973-10-03 Cement Plug 2371.30 2438.40 0
1973-10-18 Cement Plug 288.00 327.70 0
1973-10-19 Cement Plug 170.40 203.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

References