X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425021003003

Well Details

Well ID: 0425021003003
Loading map...
Location: 00/03-10-042-02W5/3
Location Alias: 00/03-10-42-02 W5M
Location Alias 2: 00/03-10-042-02 W5/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 02
Section: 10
County/Municipality: Ponoka County
Well Name: NAL GILBY 3-10-42-2
Operator Name: NAL Resources Limited
License Number: 0231195
License Date: 1999-12-22
License Status: Issued
Spud Date: 2000-01-13
Final Drill Date: 2000-01-23
Well Total Depth: 1930.00 m
Surface Hole Latitude: 52.599311
Surface Hole Longitude: -114.209929

For data sources see[1][2]

Well History

Date Event
1999-12-22 Obtained License
2000-01-16 Surface Casing Operation Performed
2000-01-23 Finished Drilling
2000-01-23 Well Log Performed
2000-01-23 Well Mode changed to Drilled and Cased
2000-01-25 Production Casing Operation Performed
2000-01-25 Rig Released
2000-03-08 Perforation Treatment Performed - Jet Perforation
2000-03-08 Well Log Performed
2000-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-04 Plug Back Performed
2002-01-05 Perforation Treatment Performed - Jet Perforation
2002-01-05 Well Log Performed
2002-01-06 Perforation Treatment Performed - Fractured
2010-06-28 Well Log Performed
2010-06-29 Perforation Treatment Performed - Jet Perforation
2010-06-29 Well Log Performed
2010-07-04 Perforation Treatment Performed - Fractured
2010-07-12 Well Began Production
2010-07-12 Well Fluid changed to Gas
2010-07-12 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-08 Perforation 1866.00 1869.50 17
2010-06-29 Perforation 1827.00 1828.00 17
2010-07-04 Fracture 1821.50 1828.00 0
2000-03-08 Perforation 1870.50 1879.00 17
2000-03-08 Perforation 1880.00 1882.50 17
2000-03-10 Acid Treatment 1866.00 1882.50 0
2002-01-04 Packing Device Capped w/Cement 1855.00 1863.00 0
2002-01-05 Perforation 1846.50 1849.00 17
2002-01-05 Perforation 1850.00 1851.50 17
2002-01-06 Fracture 1846.50 1851.50 0
2010-06-29 Perforation 1821.50 1824.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4128 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8736 0.0 0.0 0.0
2015 8663 0.0 0.0 0.0
2016 7930 0.0 0.0 0.0
2017 8491 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8439 0.0 0.0 0.0
2020 1933 0.0 0.0 0.0

For data sources see[5]

References