X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424252011020

Well Details

Well ID: 0424252011020
Loading map...
Location: 02/11-20-042-25W4/0
Location Alias: 02/11-20-42-25 W4M
Location Alias 2: 02/11-20-042-25 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 25
Section: 20
County/Municipality: Ponoka County
Well Name: EMBER CHIGWELL 11-20-42-25
Operator Name: Ember Resources Inc.
License Number: 0326497
License Date: 2005-02-16
License Status: Suspension
Spud Date: 2005-03-02
Final Drill Date: 2005-03-03
Well Total Depth: 550.00 m
Surface Hole Latitude: 52.632765
Surface Hole Longitude: -113.568973

For data sources see[1][2]

Well History

Date Event
2005-02-16 Obtained License
2005-03-02 Surface Casing Operation Performed
2005-03-03 Finished Drilling
2005-03-03 Production Casing Operation Performed
2005-03-03 Well Log Performed
2005-03-03 Well Mode changed to Drilled and Cased
2005-03-04 Rig Released
2005-03-23 Well Log Performed
2005-04-08 Well Log Performed
2005-05-31 Perforation Treatment Performed - Jet Perforation
2005-06-14 Perforation Treatment Performed - Fractured
2005-06-19 Well Began Production
2005-06-19 Well Fluid changed to Coalbed Methane-Coals Only
2005-06-19 Well Mode changed to Flowing
2019-02-01 Well Fluid changed to Coalbed Methane-Coals Only
2019-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-31 Perforation 521.00 522.00 13
2005-05-31 Perforation 453.50 455.00 13
2005-05-31 Perforation 451.00 452.00 13
2005-05-31 Perforation 445.50 446.50 13
2005-05-31 Perforation 443.00 444.00 13
2005-05-31 Perforation 406.00 407.00 13
2005-05-31 Perforation 397.50 398.50 13
2005-05-31 Perforation 384.00 385.00 13
2005-05-31 Perforation 381.00 382.00 13
2005-05-31 Perforation 378.00 379.00 13
2005-05-31 Perforation 339.00 340.00 13
2005-05-31 Perforation 508.00 509.00 13
2005-05-31 Perforation 321.00 322.00 13
2005-06-14 Fracture 521.00 522.00 0
2005-06-14 Fracture 508.00 509.00 0
2005-06-14 Fracture 500.00 505.00 0
2005-06-14 Fracture 493.50 495.00 0
2005-06-14 Fracture 488.00 490.00 0
2005-06-14 Fracture 480.00 481.00 0
2005-06-14 Fracture 474.00 475.00 0
2005-06-14 Fracture 469.00 471.00 0
2005-06-14 Fracture 451.00 455.00 0
2005-05-31 Perforation 504.00 505.00 13
2005-06-14 Fracture 443.00 446.50 0
2005-06-14 Fracture 406.00 407.00 0
2005-06-14 Fracture 397.50 398.50 0
2005-06-14 Fracture 384.00 385.00 0
2005-06-14 Fracture 378.00 382.00 0
2005-06-14 Fracture 339.00 340.00 0
2005-06-14 Fracture 321.00 322.00 0
2005-05-31 Perforation 500.00 503.00 13
2005-05-31 Perforation 493.50 495.00 13
2005-05-31 Perforation 488.00 490.00 13
2005-05-31 Perforation 480.00 481.00 13
2005-05-31 Perforation 474.00 475.00 13
2005-05-31 Perforation 469.00 471.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 4206 0.0 0.0 0.0
2006 8486 0.0 0.0 0.0
2007 7537 0.0 0.0 0.0
2008 8461 0.0 0.0 0.0
2009 8404 0.0 0.0 0.0
2010 8673 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8734 0.0 0.0 0.0
2015 8625 0.0 0.0 0.0
2016 8621 0.0 0.0 0.0
2017 1260 0.0 0.0 0.0

For data sources see[5]

References