X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424251814000

Well Details

Well ID: 0424251814000
Loading map...
Location: 00/14-18-042-25W4/0
Location Alias: 00/14-18-42-25 W4M
Location Alias 2: 00/14-18-042-25 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 25
Section: 18
County/Municipality: Ponoka County
Well Name: OEI CHIGWELL 14-18-42-25
Operator Name: AlphaBow Energy Ltd.
License Number: 0081633
License Date: 1980-03-12
License Status: Issued
Spud Date: 1980-04-30
Final Drill Date: 1980-05-13
Well Total Depth: 1647.00 m
Surface Hole Latitude: 52.620162
Surface Hole Longitude: -113.594922

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-03-12 Obtained License
1980-05-08 Drill Stem Test Performed
1980-05-10 Drill Stem Test Performed
1980-05-12 Drill Stem Test Performed
1980-05-13 Finished Drilling
1980-05-13 Well Log Performed
1980-05-13 Well Mode changed to Drilled and Cased
1980-05-14 Drill Stem Test Performed
1980-05-15 Drill Stem Test Performed
1980-05-16 Drill Stem Test Performed
1980-05-17 Production Casing Operation Performed
1980-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-16 Perforation Treatment Performed - Jet Perforation
1980-07-18 Perforation Treatment Performed - Fractured
1980-07-23 Well Began Production
1980-07-23 Well Fluid changed to Crude Oil
1980-07-23 Well Mode changed to Flowing
1981-05-26 Well Fluid changed to Crude Oil
1981-05-26 Well Mode changed to Suspended
1983-05-31 Perforation Treatment Performed - Bridge Plug No Cement Required
1983-05-31 Perforation Treatment Performed - Jet Perforation
1983-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-03 Perforation Treatment Performed - Fractured
1983-06-03 Plug Back Performed
1983-06-03 Well Fluid changed to Crude Oil
1983-06-03 Well Mode changed to Abandoned Zone
1984-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-05-31 Plug Back Performed
2000-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-18 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-16 Perforation 1538.50 1539.50 7
2011-11-18 Perforation 1377.00 1380.00 7
1980-07-16 Acid Treatment 1538.50 1539.50 0
1980-07-18 Fracture 1538.50 1539.50 0
1983-05-31 Perforation 1377.00 1380.00 7
1983-05-31 Bridge Plug, No Cement 1500.00 1501.00 0
1983-06-01 Acid Treatment 1377.00 1380.00 0
1983-06-03 Fracture 1377.00 1380.00 0
1984-05-31 Packing Device Capped w/Cement 1492.00 1500.00 0
2000-02-15 Packing Device Capped w/Cement 1367.00 1375.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1965 0.0 0.0 0.0

For data sources see[5]

References