X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424232405000

Well Details

Well ID: 0424232405000
Loading map...
Location: 00/05-24-042-23W4/0
Location Alias: 00/05-24-42-23 W4M
Location Alias 2: 00/05-24-042-23 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 24
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 5-24-42-23
Operator Name: Supreme Energy Inc.
License Number: 0154266
License Date: 1992-10-28
License Status: Suspension
Spud Date: 1992-11-13
Final Drill Date: 1992-11-22
Well Total Depth: 1777.00 m
Surface Hole Latitude: 52.627270
Surface Hole Longitude: -113.190622

For data sources see[1][2]

Well History

Date Event
1992-10-28 Obtained License
1992-11-13 Lost Circulation Occurred
1992-11-14 Surface Casing Operation Performed
1992-11-22 Finished Drilling
1992-11-22 Well Log Performed
1992-11-22 Well Mode changed to Drilled and Cased
1992-11-23 Production Casing Operation Performed
1992-11-24 Rig Released
1992-12-03 Well Log Performed
1992-12-07 Perforation Treatment Performed - Jet Perforation
1992-12-07 Well Log Performed
1992-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-20 Well Began Production
1993-01-20 Well Fluid changed to Crude Oil
1993-01-20 Well Mode changed to Flowing
1994-04-07 Well Log Performed
1994-04-09 Perforation Treatment Performed - Cement Squeeze
1994-04-11 Well Log Performed
1994-04-12 Perforation Treatment Performed - Jet Perforation
1994-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-01 Well Fluid changed to Crude Oil
1999-05-01 Well Mode changed to Suspended
2000-04-01 Well Fluid changed to Crude Oil
2000-04-01 Well Mode changed to Pumping
2001-05-01 Well Fluid changed to Crude Oil
2001-05-01 Well Mode changed to Suspended
2001-05-07 Perforation Treatment Performed - Cement Squeeze
2001-05-08 Perforation Treatment Performed - Jet Perforation
2001-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-08 Plug Back Performed
2007-07-08 Well Fluid changed to Crude Oil
2007-07-08 Well Log Performed
2007-07-08 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-07 Perforation 1754.20 1755.20 13
1992-12-09 Acid Treatment 1754.20 1755.20 0
1994-04-09 Cement Squeeze 1754.20 1755.20 0
1994-04-12 Perforation 1751.50 1753.30 13
1994-04-13 Acid Treatment 1751.50 1753.30 0
2001-05-07 Cement Squeeze 1751.50 1753.30 0
2001-05-08 Perforation 1749.00 1750.00 17
2001-05-10 Acid Treatment 1749.00 1750.00 0
2007-07-08 Packing Device Capped w/Cement 1737.00 1745.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5277 0.0 0.0 0.0
1994 5329 0.0 0.0 0.0
1998 3365 0.0 0.0 0.0
1999 1244 0.0 0.0 0.0
2000 5525 0.0 0.0 0.0
2001 180 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-11-13 Lost Circulation 70.00 290.00

For data sources see[6]

References