If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424232404005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.624635,"lon":-113.19183,"icon":""}]} |
Location: 00/04-24-042-23W4/5 | |
Location Alias: 00/04-24-42-23 W4M | |
Location Alias 2: 00/04-24-042-23 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 23 | |
Section: 24 | |
County/Municipality: Ponoka County | |
Well Name: SUPREME BASHAW 4-24-42-23 | |
Operator Name: Supreme Energy Inc. | |
License Number: 0024011 | |
License Date: 1963-03-25 | |
License Status: Issued | |
Spud Date: 1963-04-24 | |
Final Drill Date: 1963-05-14 | |
Well Total Depth: 1759.30 m | |
Surface Hole Latitude: 52.624635 | |
Surface Hole Longitude: -113.191830 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-03-25 | Obtained License |
1963-05-11 | Drill Stem Test Performed |
1963-05-14 | Finished Drilling |
1963-05-14 | Well Mode changed to Drilled and Cased |
1963-05-16 | Drill Stem Test Performed |
1963-05-17 | Drill Stem Test Performed |
1963-05-18 | Drill Stem Test Performed |
1963-05-19 | Perforation Treatment Performed - Jet Perforation |
1963-05-19 | Production Casing Operation Performed |
1963-07-16 | Perforation Treatment Performed - Selective Bullet Perforations |
1963-08-15 | Perforation Treatment Performed - Nitrogen Treatment |
1964-01-16 | Perforation Treatment Performed - Cement Squeeze |
1964-01-22 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1964-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-01-28 | Perforation Treatment Performed - Bullet Perforation |
1964-01-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-01-31 | Perforation Treatment Performed - Cement Squeeze |
1964-02-01 | Perforation Treatment Performed - Cement Squeeze |
1964-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-02-03 | Perforation Treatment Performed - Jet Perforation |
1964-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-03-04 | Perforation Treatment Performed - Cement Squeeze |
1966-03-06 | Perforation Treatment Performed - Bullet Perforation |
1966-03-07 | Perforation Treatment Performed - Acid Wash - No Pressure |
1984-11-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-11-20 | Plug Back Performed |
1984-11-21 | Well Log Performed |
1984-11-23 | Perforation Treatment Performed - Jet Perforation |
1986-01-22 | Perforation Treatment Performed - Cement Squeeze |
1986-01-24 | Perforation Treatment Performed - Jet Perforation |
1986-01-24 | Well Began Production |
1986-01-24 | Well Fluid changed to Gas |
1986-01-24 | Well Mode changed to Flowing |
1986-08-15 | Perforation Treatment Performed - Cement Squeeze |
1986-08-15 | Plug Back Performed |
1986-08-15 | Well Fluid changed to Gas |
1986-08-15 | Well Mode changed to Abandoned Zone |
1986-08-19 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-05-19 | Perforation | 1708.70 | 1711.80 | 7 |
1964-01-28 | Bullet Perforation | 1736.80 | 1737.10 | 10 |
1964-01-30 | Acid Treatment | 1736.80 | 1737.10 | 0 |
1964-01-31 | Cement Squeeze | 1736.80 | 1737.10 | 0 |
1964-02-01 | Cement Squeeze | 1736.80 | 1737.10 | 0 |
1964-02-03 | Perforation | 1738.30 | 1738.60 | 10 |
1964-02-03 | Acid Treatment | 1738.30 | 1738.60 | 0 |
1964-03-03 | Acid Treatment | 1738.30 | 1738.60 | 0 |
1966-03-04 | Cement Squeeze | 1738.30 | 1738.60 | 0 |
1966-03-06 | Bullet Perforation | 1708.70 | 1711.80 | 7 |
1966-03-07 | Acid Wash | 1708.70 | 1711.80 | 0 |
1963-07-16 | Selective Bullet Perforations | 1679.80 | 1682.50 | 0 |
1984-11-20 | Packing Device Capped w/Cement | 1689.00 | 1689.00 | 0 |
1984-11-23 | Perforation | 1485.60 | 1487.40 | 13 |
1986-01-22 | Cement Squeeze | 1485.60 | 1487.40 | 0 |
1986-01-24 | Perforation | 1459.40 | 1461.50 | 13 |
1986-01-24 | Perforation | 1461.90 | 1462.80 | 13 |
1986-08-15 | Cement Squeeze | 1459.40 | 1462.80 | 0 |
1986-08-19 | Perforation | 1708.70 | 1711.80 | 7 |
1963-07-16 | Selective Bullet Perforations | 1684.90 | 1686.80 | 0 |
1963-07-16 | Selective Bullet Perforations | 1687.40 | 1690.40 | 0 |
1963-07-16 | Selective Bullet Perforations | 1696.20 | 1701.40 | 0 |
1963-08-15 | Nitrogen Treatment | 1679.80 | 1701.40 | 0 |
1964-01-16 | Cement Squeeze | 1679.80 | 1701.40 | 0 |
1964-01-22 | Hydra Jet Perforation | 1736.10 | 1736.10 | 0 |
1964-01-26 | Acid Treatment | 1736.10 | 1736.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 707 | 0.0 | 0.0 | 0.0 |
1986 | 1429 | 0.0 | 0.0 | 0.0 |
For data sources see[5]