X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424232404005

Well Details

Well ID: 0424232404005
Loading map...
Location: 00/04-24-042-23W4/5
Location Alias: 00/04-24-42-23 W4M
Location Alias 2: 00/04-24-042-23 W4/05
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 24
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 4-24-42-23
Operator Name: Supreme Energy Inc.
License Number: 0024011
License Date: 1963-03-25
License Status: Issued
Spud Date: 1963-04-24
Final Drill Date: 1963-05-14
Well Total Depth: 1759.30 m
Surface Hole Latitude: 52.624635
Surface Hole Longitude: -113.191830

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-25 Obtained License
1963-05-11 Drill Stem Test Performed
1963-05-14 Finished Drilling
1963-05-14 Well Mode changed to Drilled and Cased
1963-05-16 Drill Stem Test Performed
1963-05-17 Drill Stem Test Performed
1963-05-18 Drill Stem Test Performed
1963-05-19 Perforation Treatment Performed - Jet Perforation
1963-05-19 Production Casing Operation Performed
1963-07-16 Perforation Treatment Performed - Selective Bullet Perforations
1963-08-15 Perforation Treatment Performed - Nitrogen Treatment
1964-01-16 Perforation Treatment Performed - Cement Squeeze
1964-01-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-28 Perforation Treatment Performed - Bullet Perforation
1964-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-31 Perforation Treatment Performed - Cement Squeeze
1964-02-01 Perforation Treatment Performed - Cement Squeeze
1964-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-03 Perforation Treatment Performed - Jet Perforation
1964-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-04 Perforation Treatment Performed - Cement Squeeze
1966-03-06 Perforation Treatment Performed - Bullet Perforation
1966-03-07 Perforation Treatment Performed - Acid Wash - No Pressure
1984-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-20 Plug Back Performed
1984-11-21 Well Log Performed
1984-11-23 Perforation Treatment Performed - Jet Perforation
1986-01-22 Perforation Treatment Performed - Cement Squeeze
1986-01-24 Perforation Treatment Performed - Jet Perforation
1986-01-24 Well Began Production
1986-01-24 Well Fluid changed to Gas
1986-01-24 Well Mode changed to Flowing
1986-08-15 Perforation Treatment Performed - Cement Squeeze
1986-08-15 Plug Back Performed
1986-08-15 Well Fluid changed to Gas
1986-08-15 Well Mode changed to Abandoned Zone
1986-08-19 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-05-19 Perforation 1708.70 1711.80 7
1964-01-28 Bullet Perforation 1736.80 1737.10 10
1964-01-30 Acid Treatment 1736.80 1737.10 0
1964-01-31 Cement Squeeze 1736.80 1737.10 0
1964-02-01 Cement Squeeze 1736.80 1737.10 0
1964-02-03 Perforation 1738.30 1738.60 10
1964-02-03 Acid Treatment 1738.30 1738.60 0
1964-03-03 Acid Treatment 1738.30 1738.60 0
1966-03-04 Cement Squeeze 1738.30 1738.60 0
1966-03-06 Bullet Perforation 1708.70 1711.80 7
1966-03-07 Acid Wash 1708.70 1711.80 0
1963-07-16 Selective Bullet Perforations 1679.80 1682.50 0
1984-11-20 Packing Device Capped w/Cement 1689.00 1689.00 0
1984-11-23 Perforation 1485.60 1487.40 13
1986-01-22 Cement Squeeze 1485.60 1487.40 0
1986-01-24 Perforation 1459.40 1461.50 13
1986-01-24 Perforation 1461.90 1462.80 13
1986-08-15 Cement Squeeze 1459.40 1462.80 0
1986-08-19 Perforation 1708.70 1711.80 7
1963-07-16 Selective Bullet Perforations 1684.90 1686.80 0
1963-07-16 Selective Bullet Perforations 1687.40 1690.40 0
1963-07-16 Selective Bullet Perforations 1696.20 1701.40 0
1963-08-15 Nitrogen Treatment 1679.80 1701.40 0
1964-01-16 Cement Squeeze 1679.80 1701.40 0
1964-01-22 Hydra Jet Perforation 1736.10 1736.10 0
1964-01-26 Acid Treatment 1736.10 1736.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 707 0.0 0.0 0.0
1986 1429 0.0 0.0 0.0

For data sources see[5]

References