X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424232404000

Well Details

Well ID: 0424232404000
Loading map...
Location: 00/04-24-042-23W4/0
Location Alias: 00/04-24-42-23 W4M
Location Alias 2: 00/04-24-042-23 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 24
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 4-24-42-23
Operator Name: Supreme Energy Inc.
License Number: 0024011
License Date: 1963-03-25
License Status: Issued
Spud Date: 1963-04-24
Final Drill Date: 1963-05-14
Well Total Depth: 1759.30 m
Surface Hole Latitude: 52.624635
Surface Hole Longitude: -113.191830

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-25 Obtained License
1963-05-11 Drill Stem Test Performed
1963-05-14 Finished Drilling
1963-05-14 Well Mode changed to Drilled and Cased
1963-05-16 Drill Stem Test Performed
1963-05-17 Drill Stem Test Performed
1963-05-18 Drill Stem Test Performed
1963-05-19 Perforation Treatment Performed - Jet Perforation
1963-05-19 Production Casing Operation Performed
1963-06-14 Well Began Production
1963-06-14 Well Fluid changed to Crude Oil
1963-06-14 Well Mode changed to Flowing
1963-07-16 Perforation Treatment Performed - Selective Bullet Perforations
1963-08-01 Well Fluid changed to Crude Oil
1963-08-01 Well Mode changed to Flowing
1963-08-15 Perforation Treatment Performed - Nitrogen Treatment
1964-01-16 Perforation Treatment Performed - Cement Squeeze
1964-01-16 Well Fluid changed to Crude Oil
1964-01-16 Well Mode changed to Flowing
1964-01-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-28 Perforation Treatment Performed - Bullet Perforation
1964-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-31 Perforation Treatment Performed - Cement Squeeze
1964-02-01 Perforation Treatment Performed - Cement Squeeze
1964-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-03 Perforation Treatment Performed - Jet Perforation
1964-02-06 Well Fluid changed to Crude Oil
1964-02-06 Well Mode changed to Flowing
1964-02-14 Well Fluid changed to Crude Oil
1964-02-14 Well Mode changed to Pumping
1964-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-04 Perforation Treatment Performed - Cement Squeeze
1966-03-04 Well Fluid changed to Crude Oil
1966-03-04 Well Mode changed to Pumping
1966-03-06 Perforation Treatment Performed - Bullet Perforation
1966-03-07 Perforation Treatment Performed - Acid Wash - No Pressure
1984-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-20 Plug Back Performed
1984-11-20 Well Fluid changed to Crude Oil
1984-11-20 Well Mode changed to Abandoned Zone
1984-11-21 Well Log Performed
1984-11-23 Perforation Treatment Performed - Jet Perforation
1986-01-22 Perforation Treatment Performed - Cement Squeeze
1986-01-24 Perforation Treatment Performed - Jet Perforation
1986-08-15 Perforation Treatment Performed - Cement Squeeze
1986-08-15 Plug Back Performed
1986-08-19 Perforation Treatment Performed - Jet Perforation
1986-08-22 Well Fluid changed to Crude Oil
1986-08-22 Well Mode changed to Flowing
1988-10-18 Well Fluid changed to Crude Oil
1988-10-18 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-05-19 Perforation 1708.70 1711.80 7
1964-01-28 Bullet Perforation 1736.80 1737.10 10
1964-01-30 Acid Treatment 1736.80 1737.10 0
1964-01-31 Cement Squeeze 1736.80 1737.10 0
1964-02-01 Cement Squeeze 1736.80 1737.10 0
1964-02-03 Perforation 1738.30 1738.60 10
1964-02-03 Acid Treatment 1738.30 1738.60 0
1964-03-03 Acid Treatment 1738.30 1738.60 0
1966-03-04 Cement Squeeze 1738.30 1738.60 0
1966-03-06 Bullet Perforation 1708.70 1711.80 7
1966-03-07 Acid Wash 1708.70 1711.80 0
1963-07-16 Selective Bullet Perforations 1679.80 1682.50 0
1984-11-20 Packing Device Capped w/Cement 1689.00 1689.00 0
1984-11-23 Perforation 1485.60 1487.40 13
1986-01-22 Cement Squeeze 1485.60 1487.40 0
1986-01-24 Perforation 1459.40 1461.50 13
1986-01-24 Perforation 1461.90 1462.80 13
1986-08-15 Cement Squeeze 1459.40 1462.80 0
1986-08-19 Perforation 1708.70 1711.80 7
1963-07-16 Selective Bullet Perforations 1684.90 1686.80 0
1963-07-16 Selective Bullet Perforations 1687.40 1690.40 0
1963-07-16 Selective Bullet Perforations 1696.20 1701.40 0
1963-08-15 Nitrogen Treatment 1679.80 1701.40 0
1964-01-16 Cement Squeeze 1679.80 1701.40 0
1964-01-22 Hydra Jet Perforation 1736.10 1736.10 0
1964-01-26 Acid Treatment 1736.10 1736.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 7601 0.0 0.0 0.0
1970 5622 0.0 0.0 0.0
1971 7440 0.0 0.0 0.0
1972 7946 0.0 0.0 0.0
1973 8017 0.0 0.0 0.0
1974 7389 0.0 0.0 0.0
1975 7270 0.0 0.0 0.0
1976 7316 0.0 0.0 0.0
1977 7653 0.0 0.0 0.0
1978 7350 0.0 0.0 0.0
1979 8454 0.0 0.0 0.0
1980 8228 0.0 0.0 0.0
1981 8262 0.0 0.0 0.0
1982 8331 0.0 0.0 0.0
1983 7899 0.0 0.0 0.0
1984 7217 0.0 0.0 0.0
1986 3046 0.0 0.0 0.0
1987 7906 0.0 0.0 0.0
1988 7107 0.0 0.0 0.0
1989 5654 0.0 0.0 0.0
1990 7850 0.0 0.0 0.0
1991 7683 0.0 0.0 0.0
1992 8196 0.0 0.0 0.0
1993 8461 0.0 0.0 0.0
1994 8417 0.0 0.0 0.0
1995 8353 0.0 0.0 0.0
1996 8266 0.0 0.0 0.0
1997 7510 0.0 0.0 0.0
1998 8414 0.0 0.0 0.0
1999 7480 0.0 0.0 0.0
2000 8037 0.0 0.0 0.0
2001 7099 0.0 0.0 0.0
2002 6993 0.0 0.0 0.0
2003 5444 0.0 0.0 0.0
2004 8743 0.0 0.0 0.0
2005 8045 0.0 0.0 0.0
2006 7989 0.0 0.0 0.0
2007 8284 0.0 0.0 0.0
2008 7494 0.0 0.0 0.0
2009 8724 0.0 0.0 0.0
2010 8641 0.0 0.0 0.0
2011 6800 0.0 0.0 0.0
2012 1282 0.0 0.0 0.0
2013 7726 0.0 0.0 0.0
2014 1020 0.0 0.0 0.0
2015 7703 0.0 0.0 0.0
2016 3729 0.0 0.0 0.0
2017 7142 0.0 0.0 0.0
2018 7370 0.0 0.0 0.0
2019 8298 0.0 0.0 0.0
2020 2060 0.0 0.0 0.0

For data sources see[5]

References