X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424231312000

Well Details

Well ID: 0424231312000
Loading map...
Location: 00/12-13-042-23W4/0
Location Alias: 00/12-13-42-23 W4M
Location Alias 2: 00/12-13-042-23 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 13
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 12-13-42-23
Operator Name: Supreme Energy Inc.
License Number: 0023525
License Date: 1962-12-17
License Status: Abandoned
Spud Date: 1962-12-20
Final Drill Date: 1963-02-06
Well Total Depth: 1783.70 m
Surface Hole Latitude: 52.617401
Surface Hole Longitude: -113.192043

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-12-17 Obtained License
1962-12-20 Direction Drilling Operation Performed - 98
1963-02-06 Finished Drilling
1963-02-06 Well Mode changed to Drilled and Cased
1963-02-08 Production Casing Operation Performed
1963-02-12 Perforation Treatment Performed - Selective Bullet Perforations
1963-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-22 Perforation Treatment Performed - Cement Squeeze
1963-03-02 Perforation Treatment Performed - Cement Squeeze
1963-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-09 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-03-16 Perforation Treatment Performed - Cement Squeeze
1963-03-21 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-07 Perforation Treatment Performed - Cement Squeeze
1963-05-08 Perforation Treatment Performed - Jet Perforation
1963-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-22 Perforation Treatment Performed - Jet Perforation
1963-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-01 Well Began Production
1963-08-01 Well Fluid changed to Crude Oil
1963-08-01 Well Mode changed to Pumping
1963-08-02 Well Fluid changed to Crude Oil
1963-08-02 Well Mode changed to Pumping
1963-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-15 Perforation Treatment Performed - Nitrogen Treatment
1966-02-10 Well Fluid changed to Crude Oil
1966-02-10 Well Mode changed to Suspended
1975-10-12 Well Fluid changed to Crude Oil
1975-10-12 Well Mode changed to Pumping
1977-02-15 Well Fluid changed to Crude Oil
1977-02-15 Well Mode changed to Suspended
1980-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-08-07 Well Fluid changed to Crude Oil
1980-08-07 Well Mode changed to Abandoned Zone
1980-08-27 Well Log Performed
1981-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-13 Perforation Treatment Performed - Cement Squeeze
1981-02-17 Perforation Treatment Performed - Jet Perforation
1981-02-19 Perforation Treatment Performed - Jet Perforation
1981-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-08-08 Well Log Performed
2007-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-09 Perforation Treatment Performed - Jet Perforation
2007-08-09 Plug Back Performed
2007-08-09 Well Log Performed
2007-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-10 Perforation Treatment Performed - Remedial Casing
2007-08-13 Well Log Performed
2007-08-14 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1962-12-20 1460.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-12 Selective Bullet Perforations 1737.70 1743.80 0
1963-03-16 Cement Squeeze 1763.00 1763.00 0
1963-03-21 Hydra Jet Perforation 1762.40 1762.40 0
1963-04-13 Acid Treatment 1762.40 1762.40 0
1963-04-16 Acid Treatment 1762.40 1762.40 0
1963-05-03 Acid Treatment 1762.40 1762.40 0
1963-05-07 Cement Squeeze 1762.40 1762.40 0
1963-05-08 Perforation 1762.40 1762.40 7
1963-05-09 Acid Treatment 1762.40 1762.40 0
1963-05-22 Perforation 1760.50 1760.50 7
1963-05-23 Acid Treatment 1760.50 1760.50 0
1963-02-12 Selective Bullet Perforations 1724.60 1732.20 0
1963-08-15 Nitrogen Treatment 1713.30 1737.70 0
1963-08-15 Acid Treatment 1707.20 1737.70 0
1980-08-07 Packing Device Capped w/Cement 1750.00 1755.00 0
1981-02-13 Acid Treatment 1707.20 1737.20 0
1981-02-13 Cement Squeeze 1707.20 1737.20 0
1981-02-17 Perforation 1734.40 1736.40 13
1981-02-19 Perforation 1710.50 1712.50 13
1981-02-20 Acid Treatment 1710.50 1712.50 0
2007-08-09 Packing Device Capped w/Cement 1688.00 1696.00 0
2007-08-09 Perforation 540.00 541.00 14
1963-02-12 Selective Bullet Perforations 1713.30 1715.70 0
2007-08-10 Remedial Casing Cementing 540.00 541.00 0
2007-08-10 Packing Device Capped w/Cement 521.00 536.00 0
1963-02-12 Selective Bullet Perforations 1698.30 1698.30 0
1963-02-13 Acid Treatment 1698.30 1743.80 0
1963-02-22 Cement Squeeze 1698.30 1698.30 0
1963-03-02 Cement Squeeze 1743.80 1743.80 0
1963-03-06 Acid Treatment 1713.30 1737.70 0
1963-03-09 Hydra Jet Perforation 1763.00 1763.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1975 529 0.0 0.0 0.0

For data sources see[6]

References