X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424230110000

Well Details

Well ID: 0424230110000
Loading map...
Location: 00/10-01-042-23W4/0
Location Alias: 00/10-01-42-23 W4M
Location Alias 2: 00/10-01-042-23 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 01
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 10-1-42-23
Operator Name: Supreme Energy Inc.
License Number: 0023930
License Date: 1963-03-04
License Status: Issued
Spud Date: 1963-03-10
Final Drill Date: 1963-03-21
Well Total Depth: 1742.20 m
Surface Hole Latitude: 52.588567
Surface Hole Longitude: -113.180019

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-04 Obtained License
1963-03-21 Finished Drilling
1963-03-21 Well Mode changed to Drilled and Cased
1963-03-22 Production Casing Operation Performed
1963-04-24 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-04-24 Perforation Treatment Performed - Selective Bullet Perforations
1963-05-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-06-14 Well Began Production
1963-06-14 Well Fluid changed to Crude Oil
1963-06-14 Well Mode changed to Gas Lift
1963-07-17 Well Fluid changed to Crude Oil
1963-07-17 Well Mode changed to Gas Lift
1964-07-30 Well Fluid changed to Crude Oil
1964-07-30 Well Mode changed to Pumping
1965-07-30 Well Fluid changed to Crude Oil
1965-07-30 Well Mode changed to Suspended
1982-09-23 Perforation Treatment Performed - Cement Squeeze
1982-09-23 Well Fluid changed to Crude Oil
1982-09-23 Well Mode changed to Abandoned Zone
1982-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-25 Perforation Treatment Performed - Jet Perforation
1985-10-30 Perforation Treatment Performed - Cement Squeeze
1985-10-31 Well Log Performed
1985-11-01 Perforation Treatment Performed - Jet Perforation
1985-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-24 Perforation Treatment Performed - Jet Perforation
2001-04-25 Perforation Treatment Performed - Cement Squeeze
2001-04-26 Perforation Treatment Performed - Remedial Casing
2001-04-29 Perforation Treatment Performed - Jet Perforation
2001-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-28 Perforation Treatment Performed - Jet Perforation
2002-08-28 Well Log Performed
2002-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-04-24 Hydra Jet Perforation 1729.10 1729.10 0
1982-09-25 Perforation 1724.50 1724.80 13
1982-09-25 Acid Treatment 1724.50 1724.80 0
1985-10-30 Cement Squeeze 1724.50 1724.80 0
1985-11-01 Perforation 1725.40 1725.60 4
1985-11-02 Acid Treatment 1725.40 1725.60 0
2001-04-24 Perforation 688.00 689.00 13
2001-04-25 Cement Squeeze 1725.40 1725.60 0
2001-04-26 Remedial Casing Cementing 688.00 689.00 0
2001-04-29 Perforation 1723.00 1723.70 17
2001-04-30 Acid Treatment 1723.00 1723.70 0
1963-04-24 Selective Bullet Perforations 1679.80 1680.40 0
2002-08-28 Perforation 1720.00 1722.50 20
2002-08-29 Acid Treatment 1720.00 1723.70 0
1963-04-24 Selective Bullet Perforations 1681.60 1683.40 0
1963-04-24 Selective Bullet Perforations 1684.00 1684.00 0
1963-04-24 Acid Treatment 1679.80 1729.10 0
1963-05-18 Packing Device Capped w/Cement 1727.90 1727.90 0
1963-05-18 Hydra Jet Perforation 1727.00 1727.00 0
1982-09-23 Cement Squeeze 1727.00 1727.00 0
1982-09-23 Cement Squeeze 1679.80 1684.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

References