X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424223416000

Well Details

Well ID: 0424223416000
Loading map...
Location: 00/16-34-042-22W4/0
Location Alias: 00/16-34-42-22 W4M
Location Alias 2: 00/16-34-042-22 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 34
County/Municipality: Ponoka County
Well Name: EMBER MALMO 16-34-42-22
Operator Name: Ember Resources Inc.
License Number: 0336292
License Date: 2005-08-11
License Status: Issued
Spud Date: 2005-09-06
Final Drill Date: 2005-09-23
Well Total Depth: 401.40 m
Surface Hole Latitude: 52.664219
Surface Hole Longitude: -113.081336

For data sources see[1][2]

Well History

Date Event
2005-08-11 Obtained License
2005-09-06 Surface Casing Operation Performed
2005-09-23 Finished Drilling
2005-09-23 Production Casing Operation Performed
2005-09-23 Rig Released
2005-09-23 Well Mode changed to Drilled and Cased
2005-10-13 Well Log Performed
2005-10-23 Perforation Treatment Performed - Jet Perforation
2005-10-24 Perforation Treatment Performed - Fractured
2005-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-07 Plug Back Performed
2005-11-07 Well Log Performed
2005-11-07 Well Mode changed to Abandoned Zone
2005-11-08 Perforation Treatment Performed - Jet Perforation
2005-11-13 Perforation Treatment Performed - Fractured
2007-03-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-23 Perforation 366.00 369.00 17
2005-11-08 Perforation 238.00 240.00 13
2005-11-08 Perforation 252.00 253.50 13
2005-11-08 Perforation 272.50 274.50 13
2005-11-08 Perforation 278.50 279.50 13
2005-11-08 Perforation 281.50 282.50 13
2005-11-08 Perforation 289.00 290.00 13
2005-11-08 Perforation 304.00 305.00 13
2005-11-08 Perforation 311.00 312.50 13
2005-11-08 Perforation 332.00 333.00 13
2005-11-13 Fracture 215.00 216.00 0
2005-10-23 Perforation 363.00 366.00 17
2005-11-13 Fracture 217.50 218.50 0
2005-11-13 Fracture 221.50 223.50 0
2005-11-13 Fracture 226.00 227.50 0
2005-11-13 Fracture 233.50 235.00 0
2005-11-13 Fracture 238.00 240.00 0
2005-11-13 Fracture 252.00 253.50 0
2005-11-13 Fracture 272.50 274.50 0
2005-11-13 Fracture 278.50 279.50 0
2005-11-13 Fracture 281.50 282.50 0
2005-11-13 Fracture 289.00 290.00 0
2005-10-24 Fracture 363.00 369.00 0
2005-11-13 Fracture 304.00 305.00 0
2005-11-13 Fracture 311.00 312.50 0
2005-11-13 Fracture 332.00 333.00 0
2005-11-07 Packing Device Capped w/Cement 352.00 360.00 0
2005-11-08 Perforation 215.00 216.00 13
2005-11-08 Perforation 217.50 218.50 13
2005-11-08 Perforation 221.50 223.50 13
2005-11-08 Perforation 226.00 227.50 13
2005-11-08 Perforation 233.50 235.00 13

For data sources see[4]



References