X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424223402000

Well Details

Well ID: 0424223402000
Loading map...
Location: 00/02-34-042-22W4/0
Location Alias: 00/02-34-42-22 W4M
Location Alias 2: 00/02-34-042-22 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 34
County/Municipality: Ponoka County
Well Name: EMBER MALMO 2-34-42-22
Operator Name: Ember Resources Inc.
License Number: 0336289
License Date: 2005-08-11
License Status: Issued
Spud Date: 2005-09-23
Final Drill Date: 2005-09-24
Well Total Depth: 396.00 m
Surface Hole Latitude: 52.653757
Surface Hole Longitude: -113.081756

For data sources see[1][2]

Well History

Date Event
2005-08-11 Obtained License
2005-09-24 Finished Drilling
2005-09-24 Production Casing Operation Performed
2005-09-24 Rig Released
2005-09-24 Well Mode changed to Drilled and Cased
2005-10-13 Well Log Performed
2005-10-30 Perforation Treatment Performed - Jet Perforation
2005-11-20 Perforation Treatment Performed - Fractured
2005-12-05 Well Began Production
2005-12-05 Well Fluid changed to Coalbed Methane-Coals Only
2005-12-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-30 Perforation 217.50 218.50 13
2005-10-30 Perforation 295.50 298.00 13
2005-10-30 Perforation 313.50 314.50 13
2005-10-30 Perforation 326.50 327.50 13
2005-11-20 Fracture 217.50 218.50 0
2005-11-20 Fracture 219.50 220.50 0
2005-11-20 Fracture 223.50 226.50 0
2005-11-20 Fracture 228.00 229.00 0
2005-11-20 Fracture 239.50 242.50 0
2005-11-20 Fracture 255.00 256.00 0
2005-11-20 Fracture 279.00 282.00 0
2005-10-30 Perforation 219.50 220.50 13
2005-11-20 Fracture 284.00 285.50 0
2005-11-20 Fracture 287.50 288.50 0
2005-11-20 Fracture 295.50 298.00 0
2005-11-20 Fracture 313.50 314.50 0
2005-11-20 Fracture 326.50 327.50 0
2005-10-30 Perforation 223.50 226.50 13
2005-10-30 Perforation 228.00 229.00 13
2005-10-30 Perforation 239.50 242.50 13
2005-10-30 Perforation 255.00 256.00 13
2005-10-30 Perforation 279.00 282.00 13
2005-10-30 Perforation 284.00 285.50 13
2005-10-30 Perforation 287.50 288.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 384 0.0 0.0 0.0
2006 6239 0.0 0.0 0.0
2007 8463 0.0 0.0 0.0
2008 8366 0.0 0.0 0.0
2009 8690 0.0 0.0 0.0
2010 8741 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8467 0.0 0.0 0.0
2017 8657 0.0 0.0 0.0
2018 8623 0.0 0.0 0.0
2019 8222 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[5]

References