X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424223309002

Well Details

Well ID: 0424223309002
Loading map...
Location: 00/09-33-042-22W4/2
Location Alias: 00/09-33-42-22 W4M
Location Alias 2: 00/09-33-042-22 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 33
County/Municipality: Ponoka County
Well Name: EMBER BASHAW 9-33-42-22
Operator Name: Ember Resources Inc.
License Number: 0351534
License Date: 2006-02-08
License Status: Issued
Spud Date: 2006-03-06
Final Drill Date: 2006-03-07
Well Total Depth: 728.00 m
Surface Hole Latitude: 52.661037
Surface Hole Longitude: -113.104341

For data sources see[1][2]

Well History

Date Event
2006-02-08 Obtained License
2006-03-06 Surface Casing Operation Performed
2006-03-07 Finished Drilling
2006-03-07 Production Casing Operation Performed
2006-03-07 Rig Released
2006-03-07 Well Log Performed
2006-03-07 Well Mode changed to Drilled and Cased
2006-03-12 Perforation Treatment Performed - Jet Perforation
2006-03-13 Perforation Treatment Performed - Jet Perforation
2006-03-19 Perforation Treatment Performed - Fractured
2006-06-26 Well Began Production
2006-06-26 Well Fluid changed to Coalbed Methane-Coals Only
2006-06-26 Well Mode changed to Flowing
2009-05-31 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-12 Perforation 442.00 446.80 14
2006-03-13 Perforation 347.80 348.40 7
2006-03-13 Perforation 341.20 342.90 7
2006-03-13 Perforation 329.30 330.90 7
2006-03-13 Perforation 321.60 322.00 7
2006-03-13 Perforation 317.40 318.00 7
2006-03-13 Perforation 308.60 309.00 7
2006-03-13 Perforation 303.50 303.90 7
2006-03-13 Perforation 301.30 301.80 7
2006-03-13 Perforation 291.00 292.30 7
2006-03-13 Perforation 281.70 282.30 7
2006-03-12 Perforation 431.80 434.00 14
2006-03-13 Perforation 281.70 282.30 7
2006-03-13 Perforation 279.00 280.00 7
2006-03-13 Perforation 273.60 276.30 7
2006-03-13 Perforation 256.20 257.00 7
2006-03-13 Perforation 243.90 244.30 7
2006-03-13 Perforation 238.30 239.50 7
2006-03-13 Perforation 232.70 233.00 7
2006-03-13 Perforation 225.40 226.60 7
2006-03-13 Perforation 222.40 223.50 7
2006-03-13 Perforation 216.60 216.90 7
2006-03-12 Perforation 425.30 428.00 14
2006-03-19 Fracture 216.60 348.40 0
2006-03-12 Perforation 417.00 421.00 14
2006-03-12 Perforation 413.00 417.00 14
2006-03-12 Perforation 409.70 410.90 14
2006-03-12 Perforation 405.50 407.50 14
2006-03-12 Perforation 393.80 396.20 14
2006-03-12 Perforation 390.60 393.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4512 0.0 0.0 0.0
2007 8741 0.0 0.0 0.0
2008 8625 0.0 0.0 0.0
2009 3379 0.0 0.0 0.0

For data sources see[5]

References