X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424222007000

Well Details

Well ID: 0424222007000
Loading map...
Location: 00/07-20-042-22W4/0
Location Alias: 00/07-20-42-22 W4M
Location Alias 2: 00/07-20-042-22 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 20
County/Municipality: Ponoka County
Well Name: BONANZA ET AL BASHAW 7-20-42-22
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0053118
License Date: 1975-02-28
License Status: RecCertified
Spud Date: 1975-03-10
Final Drill Date: 1975-03-16
Well Total Depth: 1463.00 m
Surface Hole Latitude: 52.626666
Surface Hole Longitude: -113.130244

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-28 Obtained License
1975-03-16 Drill Stem Test Performed
1975-03-16 Finished Drilling
1975-03-17 Production Casing Operation Performed
1975-03-24 Perforation Treatment Performed - Jet Perforation
1975-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-04-01 Perforation Treatment Performed - Jet Perforation
1975-04-02 Perforation Treatment Performed - Cement Squeeze
1975-04-03 Perforation Treatment Performed - Jet Perforation
1975-04-15 Well Mode changed to Drilled and Cased
1976-10-01 Well Began Production
1976-10-01 Well Fluid changed to Gas
1976-10-01 Well Mode changed to Flowing
1980-09-30 Well Fluid changed to Gas
1980-09-30 Well Mode changed to Suspended
1982-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-24 Perforation Treatment Performed - Cement Squeeze
1982-06-24 Well Abandoned
1982-06-24 Well Fluid changed to Gas
1982-06-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-24 Perforation 1392.60 1394.80 7
1975-03-26 Acid Treatment 1392.60 1394.80 0
1975-04-01 Perforation 1402.10 1402.70 13
1975-04-02 Cement Squeeze 1402.10 1402.70 0
1975-04-03 Perforation 1392.90 1396.00 7
1982-06-23 Packing Device Capped w/Cement 1367.00 1380.00 0
1982-06-24 Cement Squeeze 295.00 295.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 25 0.0 0.0 0.0
1976 2140 0.0 0.0 0.0
1977 6812 0.0 0.0 0.0
1978 6292 0.0 0.0 0.0
1979 8704 0.0 0.0 0.0
1980 2918 0.0 0.0 0.0

For data sources see[5]

References