X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424221005032

Well Details

Well ID: 0424221005032
Loading map...
Location: 03/05-10-042-22W4/2
Location Alias: 03/05-10-42-22 W4M
Location Alias 2: 03/05-10-042-22 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 22
Section: 10
County/Municipality: Camrose County
Well Name: EMBER 103 BASHAW 5-10-42-22
Operator Name: Ember Resources Inc.
License Number: 0334660
License Date: 2005-07-15
License Status: Issued
Spud Date: 2005-08-13
Final Drill Date: 2005-08-14
Well Total Depth: 420.00 m
Surface Hole Latitude: 52.599794
Surface Hole Longitude: -113.095088

For data sources see[1][2]

Well History

Date Event
2005-07-15 Obtained License
2005-08-13 Surface Casing Operation Performed
2005-08-14 Finished Drilling
2005-08-14 Production Casing Operation Performed
2005-08-14 Well Mode changed to Drilled and Cased
2005-08-15 Rig Released
2005-09-30 Well Log Performed
2005-10-22 Perforation Treatment Performed - Jet Perforation
2005-10-22 Well Log Performed
2005-10-23 Perforation Treatment Performed - Fractured
2005-11-09 Well Log Performed
2005-11-12 Perforation Treatment Performed - Jet Perforation
2005-11-26 Perforation Treatment Performed - Fractured
2006-02-13 Well Began Production
2006-02-13 Well Fluid changed to Coalbed Methane-Coals Only
2006-02-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-22 Perforation 385.50 387.00 17
2005-11-12 Perforation 274.50 275.50 13
2005-11-12 Perforation 269.00 270.00 13
2005-11-12 Perforation 252.00 254.00 13
2005-11-12 Perforation 248.50 250.50 13
2005-11-12 Perforation 235.00 237.00 13
2005-11-26 Fracture 352.50 353.50 0
2005-11-26 Fracture 331.00 332.00 0
2005-11-26 Fracture 315.00 316.00 0
2005-11-26 Fracture 298.50 302.00 0
2005-11-26 Fracture 274.50 275.50 0
2005-10-22 Perforation 390.50 393.00 17
2005-11-26 Fracture 269.00 270.00 0
2005-11-26 Fracture 252.00 254.00 0
2005-11-26 Fracture 248.50 250.50 0
2005-11-26 Fracture 235.00 237.00 0
2005-10-22 Perforation 396.50 398.50 17
2005-10-22 Perforation 400.50 402.50 17
2005-10-23 Fracture 385.50 402.50 0
2005-11-12 Perforation 352.50 353.50 13
2005-11-12 Perforation 331.00 332.00 13
2005-11-12 Perforation 315.00 316.00 13
2005-11-12 Perforation 298.50 302.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7042 0.0 0.0 0.0
2007 8372 0.0 0.0 0.0
2008 7399 0.0 0.0 0.0
2009 6706 0.0 0.0 0.0
2010 8120 0.0 0.0 0.0
2011 8747 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8741 0.0 0.0 0.0
2016 8021 0.0 0.0 0.0
2017 5928 0.0 0.0 0.0
2018 6605 0.0 0.0 0.0
2019 6636 0.0 0.0 0.0
2020 1535 0.0 0.0 0.0

For data sources see[5]

References