If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424220702000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.595528,"lon":-113.156799,"icon":""}]} |
Location: 00/02-07-042-22W4/0 | |
Location Alias: 00/02-07-42-22 W4M | |
Location Alias 2: 00/02-07-042-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 22 | |
Section: 07 | |
County/Municipality: Ponoka County | |
Well Name: SUPREME BASHAW 2-7-42-22 | |
Operator Name: Supreme Energy Inc. | |
License Number: 0024043 | |
License Date: 1963-04-10 | |
License Status: Abandoned | |
Spud Date: 1963-04-11 | |
Final Drill Date: 1963-04-26 | |
Well Total Depth: 1792.80 m | |
Surface Hole Latitude: 52.595528 | |
Surface Hole Longitude: -113.156799 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-04-10 | Obtained License |
1963-04-26 | Finished Drilling |
1963-04-26 | Well Mode changed to Drilled and Cased |
1963-04-27 | Production Casing Operation Performed |
1963-05-13 | Perforation Treatment Performed - Bullet Perforation |
1963-05-13 | Perforation Treatment Performed - Selective Bullet Perforations |
1963-05-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-05-19 | Well Began Production |
1963-05-19 | Well Fluid changed to Crude Oil |
1963-05-19 | Well Mode changed to Gas Lift |
1963-06-06 | Well Fluid changed to Crude Oil |
1963-06-06 | Well Mode changed to Flowing |
1974-07-03 | Perforation Treatment Performed - Cement Squeeze |
1974-07-06 | Well Fluid changed to Crude Oil |
1974-07-06 | Well Mode changed to Flowing |
1975-07-01 | Well Fluid changed to Crude Oil |
1975-07-01 | Well Mode changed to Suspended |
1975-09-27 | Well Fluid changed to Crude Oil |
1975-09-27 | Well Mode changed to Flowing |
1987-07-21 | Well Log Performed |
1988-08-21 | Well Fluid changed to Crude Oil |
1988-08-21 | Well Mode changed to Pumping |
1989-09-25 | Well Log Performed |
1990-08-16 | Well Log Performed |
1991-05-21 | Well Log Performed |
1994-04-20 | Perforation Treatment Performed - Cement Squeeze |
1994-04-21 | Well Log Performed |
1994-04-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-04-22 | Perforation Treatment Performed - Jet Perforation |
1994-12-15 | Well Log Performed |
1994-12-17 | Perforation Treatment Performed - Cement Squeeze |
1994-12-19 | Well Log Performed |
1994-12-20 | Perforation Treatment Performed - Jet Perforation |
1994-12-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1997-12-01 | Well Fluid changed to Crude Oil |
1997-12-01 | Well Mode changed to Suspended |
2002-08-28 | Perforation Treatment Performed - Jet Perforation |
2002-08-28 | Well Log Performed |
2002-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-09-03 | Well Fluid changed to Crude Oil |
2002-09-03 | Well Mode changed to Pumping |
2002-11-28 | Well Fluid changed to Crude Oil |
2002-11-28 | Well Log Performed |
2002-11-28 | Well Mode changed to Suspended |
2006-01-05 | Well Log Performed |
2006-01-07 | Well Log Performed |
2007-01-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-07 | Plug Back Performed |
2007-01-07 | Well Fluid changed to Crude Oil |
2007-01-07 | Well Mode changed to Abandoned Zone |
2007-01-12 | Perforation Treatment Performed - Jet Perforation |
2007-01-12 | Well Log Performed |
2007-01-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-13 | Perforation Treatment Performed - Remedial Casing |
2007-01-14 | Perforation Treatment Performed - Jet Perforation |
2007-01-14 | Well Log Performed |
2007-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-17 | Perforation Treatment Performed - Remedial Casing |
2007-01-19 | Well Abandoned |
2007-01-19 | Well Fluid changed to Crude Oil |
2007-01-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-05-13 | Selective Bullet Perforations | 1735.20 | 1741.00 | 0 |
1994-12-17 | Cement Squeeze | 1772.30 | 1772.80 | 0 |
1994-12-20 | Perforation | 1770.00 | 1771.20 | 18 |
1994-12-21 | Acid Wash | 1770.00 | 1771.20 | 0 |
2002-08-28 | Perforation | 1766.90 | 1770.00 | 20 |
2002-08-29 | Acid Treatment | 1766.90 | 1771.20 | 0 |
2007-01-07 | Packing Device Capped w/Cement | 1742.00 | 1750.00 | 0 |
2007-01-07 | Packing Device Capped w/Cement | 1712.00 | 1720.00 | 0 |
2007-01-12 | Perforation | 448.00 | 449.00 | 13 |
2007-01-13 | Remedial Casing Cementing | 448.00 | 449.00 | 0 |
2007-01-13 | Packing Device Capped w/Cement | 437.00 | 445.00 | 0 |
1963-05-13 | Selective Bullet Perforations | 1731.30 | 1732.50 | 0 |
2007-01-14 | Perforation | 424.00 | 425.00 | 13 |
2007-01-17 | Remedial Casing Cementing | 424.00 | 425.00 | 0 |
2007-01-17 | Packing Device Capped w/Cement | 414.00 | 422.00 | 0 |
1963-05-13 | Selective Bullet Perforations | 1723.00 | 1726.10 | 0 |
1963-05-13 | Bullet Perforation | 1772.70 | 1772.70 | 7 |
1963-05-15 | Acid Treatment | 1723.00 | 1741.00 | 0 |
1974-07-03 | Cement Squeeze | 1723.00 | 1741.00 | 0 |
1994-04-20 | Cement Squeeze | 1772.70 | 1772.70 | 0 |
1994-04-22 | Perforation | 1772.30 | 1772.80 | 13 |
1994-04-22 | Acid Treatment | 1772.30 | 1772.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 69 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 1589 | 0.0 | 0.0 | 0.0 |
1970 | 594 | 0.0 | 0.0 | 0.0 |
1971 | 723 | 0.0 | 0.0 | 0.0 |
1972 | 2855 | 0.0 | 0.0 | 0.0 |
1973 | 3675 | 0.0 | 0.0 | 0.0 |
1975 | 448 | 0.0 | 0.0 | 0.0 |
1976 | 712 | 0.0 | 0.0 | 0.0 |
1977 | 1736 | 0.0 | 0.0 | 0.0 |
1978 | 757 | 0.0 | 0.0 | 0.0 |
1982 | 1536 | 0.0 | 0.0 | 0.0 |
1983 | 1309 | 0.0 | 0.0 | 0.0 |
1984 | 943 | 0.0 | 0.0 | 0.0 |
1985 | 7274 | 0.0 | 0.0 | 0.0 |
1986 | 450 | 0.0 | 0.0 | 0.0 |
1987 | 5720 | 0.0 | 0.0 | 0.0 |
1988 | 8162 | 0.0 | 0.0 | 0.0 |
1989 | 8230 | 0.0 | 0.0 | 0.0 |
1990 | 8236 | 0.0 | 0.0 | 0.0 |
1991 | 8211 | 0.0 | 0.0 | 0.0 |
1992 | 8352 | 0.0 | 0.0 | 0.0 |
1993 | 7783 | 0.0 | 0.0 | 0.0 |
1994 | 6025 | 0.0 | 0.0 | 0.0 |
1995 | 7278 | 0.0 | 0.0 | 0.0 |
1996 | 1853 | 0.0 | 0.0 | 0.0 |
2002 | 1176 | 0.0 | 0.0 | 0.0 |
For data sources see[5]