X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424211710023

Well Details

Well ID: 0424211710023
Loading map...
Location: 02/10-17-042-21W4/3
Location Alias: 02/10-17-42-21 W4M
Location Alias 2: 02/10-17-042-21 W4/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 21
Section: 17
County/Municipality: Camrose County
Well Name: EMBER 102 BASHAW 10-17-42-21
Operator Name: Ember Resources Inc.
License Number: 0337110
License Date: 2005-08-25
License Status: Issued
Spud Date: 2005-09-08
Final Drill Date: 2005-09-19
Well Total Depth: 703.00 m
Surface Hole Latitude: 52.617638
Surface Hole Longitude: -112.988697

For data sources see[1][2]

Well History

Date Event
2005-08-25 Obtained License
2005-09-08 Surface Casing Operation Performed
2005-09-19 Finished Drilling
2005-09-19 Production Casing Operation Performed
2005-09-19 Well Log Performed
2005-09-19 Well Mode changed to Drilled and Cased
2005-09-20 Rig Released
2005-11-01 Perforation Treatment Performed - Jet Perforation
2005-11-01 Well Log Performed
2005-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-29 Perforation Treatment Performed - Jet Perforation
2005-11-29 Plug Back Performed
2006-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-29 Plug Back Performed
2006-10-30 Perforation Treatment Performed - Jet Perforation
2006-10-31 Perforation Treatment Performed - Jet Perforation
2006-11-03 Perforation Treatment Performed - Fractured
2006-11-21 Well Began Production
2006-11-21 Well Fluid changed to Coalbed Methane-Coals Only
2006-11-21 Well Mode changed to Flowing
2009-07-04 Well Log Performed
2017-04-25 Well Fluid changed to Coalbed Methane-Coals Only
2017-04-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-01 Perforation 674.00 677.00 20
2006-10-30 Perforation 310.00 312.00 13
2006-10-30 Perforation 299.00 301.00 13
2006-10-30 Perforation 282.50 283.50 13
2006-10-30 Perforation 279.50 280.00 13
2006-10-30 Perforation 277.00 278.00 13
2006-10-30 Perforation 273.00 274.00 13
2006-10-30 Perforation 271.00 272.00 13
2006-10-30 Perforation 269.00 270.00 13
2006-10-30 Perforation 268.00 268.50 13
2006-10-30 Perforation 258.00 258.50 13
2005-11-01 Perforation 670.00 671.00 20
2006-10-30 Perforation 250.00 250.50 13
2006-10-30 Perforation 247.80 248.80 13
2006-10-30 Perforation 237.50 238.50 13
2006-10-30 Perforation 207.00 208.00 13
2006-10-31 Perforation 463.50 465.00 20
2006-11-03 Fracture 207.00 356.00 0
2005-11-29 Packing Device Capped w/Cement 657.00 665.00 0
2005-11-29 Perforation 510.00 513.00 17
2006-10-29 Packing Device Capped w/Cement 497.00 505.00 0
2006-10-30 Perforation 355.00 356.00 13
2006-10-30 Perforation 344.00 345.00 13
2006-10-30 Perforation 339.00 340.00 13
2006-10-30 Perforation 327.00 328.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 744 0.0 0.0 0.0
2007 8748 0.0 0.0 0.0
2008 8025 0.0 0.0 0.0
2009 8059 0.0 0.0 0.0
2010 8751 0.0 0.0 0.0
2011 8756 0.0 0.0 0.0
2012 5102 0.0 0.0 0.0
2013 8748 0.0 0.0 0.0
2014 8754 0.0 0.0 0.0
2015 8753 0.0 0.0 0.0
2016 8772 0.0 0.0 0.0
2017 8749 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 8752 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[5]

References