X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424141110B02

Well Details

Well ID: 0424141110B02
Loading map...
Location: B0/10-11-042-14W4/2
Location Alias: B0/10-11-42-14 W4M
Location Alias 2: B0/10-11-042-14 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 14
Section: 11
County/Municipality: Flagstaff County
Well Name: CRESCENT POINT KILLAM 10-11-42-14
Operator Name: Crescent Point Energy Corp.
License Number: 0124776
License Date: 1986-12-04
License Status: RecExempt
Spud Date: 1996-03-21
Final Drill Date: 1996-03-26
Well Total Depth: 977.00 m
Surface Hole Latitude: 52.602697
Surface Hole Longitude: -111.910707

For data sources see[1][2]

Well History

Date Event
1986-12-04 Obtained License
1996-03-21 Perforation Treatment Performed - Jet Perforation
1996-03-23 Perforation Treatment Performed - Cement Squeeze
1996-03-26 Finished Drilling
1996-03-26 Well Mode changed to Drilled and Cased
1996-03-27 Perforation Treatment Performed - Jet Perforation
1996-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-29 Rig Released
1996-04-04 Perforation Treatment Performed - Jet Perforation
1996-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-19 Perforation Treatment Performed - Fractured
1996-05-15 Well Began Injection
1996-05-15 Well Fluid changed to Water
1996-05-15 Well Type changed to Disposal
2014-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-03 Plug Back Performed
2014-02-03 Well Fluid changed to Water
2014-02-03 Well Mode changed to Abandoned Zone
2014-02-03 Well Type changed to Disposal
2014-02-04 Well Log Performed
2014-02-05 Perforation Treatment Performed - Jet Perforation
2014-02-05 Perforation Treatment Performed - Remedial Casing
2014-02-05 Well Log Performed
2014-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-06 Plug Back Performed
2014-03-09 Well Abandoned
2014-03-09 Well Fluid changed to Water
2014-03-09 Well Mode changed to Abandoned
2014-03-09 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-21 Perforation 948.00 949.50 13
2014-02-05 Perforation 357.00 358.00 17
2014-02-05 Remedial Casing Cementing 357.00 358.00 0
2014-02-06 Packing Device Capped w/Cement 340.10 351.00 0
1996-03-23 Cement Squeeze 948.00 949.50 0
1996-03-27 Perforation 961.00 965.50 13
1996-03-29 Acid Treatment 961.00 965.50 0
1996-04-04 Perforation 955.00 960.00 13
1996-04-05 Acid Treatment 955.00 965.50 0
1996-04-06 Acid Treatment 955.00 965.50 0
1996-04-19 Fracture 955.00 965.50 0
2014-02-03 Packing Device Capped w/Cement 935.30 943.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-01-06 No Incident Encountered 0.00 0.00
2014-01-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References