X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424111316000

Well Details

Well ID: 0424111316000
Loading map...
Location: 00/16-13-042-11W4/0
Location Alias: 00/16-13-42-11 W4M
Location Alias 2: 00/16-13-042-11 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 11
Section: 13
County/Municipality: Flagstaff County
Well Name: SLE KILLAM 16-13-42-11
Operator Name: SanLing Energy Ltd.
License Number: 0276196
License Date: 2002-11-19
License Status: Abandoned
Spud Date: 2002-12-07
Final Drill Date: 2002-12-29
Well Total Depth: 750.00 m
Surface Hole Latitude: 52.620276
Surface Hole Longitude: -111.449162

For data sources see[1][2]

Well History

Date Event
2002-11-19 Obtained License
2002-12-07 Surface Casing Operation Performed
2002-12-29 Finished Drilling
2002-12-29 Production Casing Operation Performed
2002-12-29 Rig Released
2002-12-29 Well Mode changed to Drilled and Cased
2003-01-02 Well Log Performed
2003-01-07 Perforation Treatment Performed - Jet Perforation
2003-01-10 Well Fluid changed to Gas
2003-01-10 Well Mode changed to Testing
2003-01-26 Perforation Treatment Performed - Fractured
2005-04-29 Perforation Treatment Performed - Jet Perforation
2005-05-29 Well Log Performed
2005-06-17 Perforation Treatment Performed - Fractured
2007-02-01 Well Fluid changed to Gas
2007-02-01 Well Mode changed to Test Completed
2018-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-04 Plug Back Performed
2018-02-04 Well Fluid changed to Gas
2018-02-04 Well Mode changed to Abandoned Zone
2018-02-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-01-07 Perforation 710.50 713.70 17
2003-01-26 Fracture 710.50 713.70 0
2005-04-29 Perforation 625.00 631.00 17
2005-06-17 Fracture 625.00 631.00 0
2018-02-04 Packing Device Capped w/Cement 682.00 690.00 0
2018-02-04 Packing Device Capped w/Cement 609.50 617.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 72 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References