X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424090515004

Well Details

Well ID: 0424090515004
Loading map...
Location: 00/15-05-042-09W4/4
Location Alias: 00/15-05-42-09 W4M
Location Alias 2: 00/15-05-042-09 W4/04
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 09
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: SLE PROVOST 15-5-42-9
Operator Name: SanLing Energy Ltd.
License Number: 0310465
License Date: 2004-06-17
License Status: Suspension
Spud Date: 2004-06-29
Final Drill Date: 2004-07-02
Well Total Depth: 824.00 m
Surface Hole Latitude: 52.591767
Surface Hole Longitude: -111.261693

For data sources see[1][2]

Well History

Date Event
2004-06-17 Obtained License
2004-06-29 Surface Casing Operation Performed
2004-07-01 Well Log Performed
2004-07-02 Finished Drilling
2004-07-02 Production Casing Operation Performed
2004-07-02 Rig Released
2004-07-02 Well Log Performed
2004-07-02 Well Mode changed to Drilled and Cased
2004-07-17 Perforation Treatment Performed - Jet Perforation
2004-07-17 Well Log Performed
2004-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-13 Plug Back Performed
2004-08-13 Well Log Performed
2004-08-14 Perforation Treatment Performed - Jet Perforation
2004-10-19 Perforation Treatment Performed - Jet Perforation
2004-10-19 Well Log Performed
2008-12-02 Perforation Treatment Performed - Casing Patch (Over Perfs)
2008-12-03 Perforation Treatment Performed - Jet Perforation
2008-12-03 Well Log Performed
2008-12-05 Well Began Production
2008-12-05 Well Fluid changed to Gas
2008-12-05 Well Mode changed to Flowing
2009-01-28 Well Structure changed to Commingled
2015-07-01 Well Fluid changed to Gas
2015-07-01 Well Mode changed to Flowing
2015-07-02 Well Fluid changed to Gas
2015-07-02 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-07-17 Perforation 799.00 800.00 17
2004-08-13 Packing Device Capped w/Cement 790.00 798.00 0
2004-08-14 Perforation 780.00 783.00 17
2004-10-19 Perforation 770.00 771.00 17
2008-12-02 Casing Patch 770.00 771.00 0
2008-12-03 Perforation 696.00 697.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 643 0.0 0.0 0.0
2009 390 0.0 0.0 0.0

For data sources see[5]

References